Coquihalla road conditions
Hope to Merritt and Kamloops over the Coquihalla Summit, then north to Valemount. Closures, winter road conditions, construction and collisions on Coquihalla Highway (Hwy 5), in order along the road.
Coquihalla Highway (Hwy 5): no full closures reported
As of 12:10 p.m. PDT. 11 entries; latest update 3 days ago.
Collisions and incidents now 0
Lane closures and construction 11
- Lane closureboth directions
Bridge maintenance: Highway 3 to Othello Rd
Since Wed, Oct 7, 11:11 a.m. PDT
Bridge maintenance from Highway 5, At Highway 3 to At Othello Rd. Starting Wed Oct 14 until Tue Oct 20. All day, every day. Left lane closed in both directions. Watch for traffic control. Nicolum Creek Bridge work. Left lanes will be closed in one direction at a time.
DriveBC · BC · updated 4 days ago
- Lane closureboth directions
Paving operations: Box Canyon Chain-Up to Zopkios Brake Check
Since Wed, Oct 7, 12:20 p.m. PDT
Paving operations from Highway 5, At Box Canyon Chain-Up to At Zopkios Brake Check. Starting Thu Oct 1. Lane closures in both directions. Watch for traffic control. Expect delays.
DriveBC · BC · updated 3 days ago
- Lane closureboth directions
Paving operations: Coquihalla Lakes Rd to Larson Hill
Since Wed, Oct 7, 12:28 p.m. PDT
Paving operations from Highway 5, At Coquihalla Lakes Rd to At Larson Hill. Starting Thu Oct 1. Lane closures in both directions. Watch for traffic control. Expect delays.
DriveBC · BC · updated 3 days ago
- Lane closureboth directions
Construction work: Exit 250 to Larson Hill to Exit 256 to Coldwater Road
Since Tue, Aug 25, 9:58 a.m. PDT
Construction work from Highway 5, At Exit 250 to Larson Hill to At Exit 256 to Coldwater Road. Starting Tue Aug 25. Left lane closed in both directions. Expect delays. 24/7 construction. Please obey signage, slow down and watch for roadside workers. Expect delays.
DriveBC · BC · updated September 5, 2026
- Constructionboth directions
Bridge construction: Merritt and Exit 286: Merritt - 97C to Exit to Highway 5A North & Merritt
Since Tue, Aug 25, 10:11 a.m. PDT
Bridge construction from Highway 5, In Merritt and Exit 286: Merritt - 97C to At Exit to Highway 5A North & Merritt. Starting Tue Aug 25 until Sat Oct 31. Watch for traffic control. Width restriction: 5m. Speed Limit restriction: 50km/h. 1 lane open in each direction at all times.
DriveBC · BC · updated August 28, 2026
- Constructionnorthbound
Paving operations: CN Junction Road to Kamloops
Since Wed, Sep 23, 12:46 p.m. PDT
Paving operations from Highway 5, CN Junction Road to In Kamloops. Starting Wed Sep 23 until Fri Oct 23. From 6:00 AM to 7:00 PM PDT, Monday to Saturday. Lane blocked. Expect delays. Watch for traffic control. Milling and Paving work.
DriveBC · BC · updated September 26, 2026
- Constructionboth directions
Construction work: Highway 5
Since Tue, Sep 8, 6:21 a.m. PDT
Construction work at Highway 5. Starting Tue Sep 8. Watch for crew and equipment working. Use caution when passing.
DriveBC · BC · updated September 16, 2026
- Lane closureboth directions
Bridge maintenance: Avola Overhead Bridge to Avola Bridge
Since Thu, Sep 24, 11:11 a.m. PDT
Bridge maintenance from Highway 5, At Avola Overhead Bridge to At Avola Bridge. Starting Thu Sep 24. From 6:00 AM to 9:00 PM PDT, weekdays. Single lane alternating traffic. Watch for traffic control.
DriveBC · BC · updated September 24, 2026
- Constructionboth directions
Mowing: Avola Overhead Bridge to Blue River Bridge
Since Thu, Sep 24, 11:02 a.m. PDT
Mowing from Highway 5, At Avola Overhead Bridge to At Blue River Bridge. Starting Thu Sep 24. From 7:00 AM to 7:00 PM PDT, weekdays. Watch for traffic control.
DriveBC · BC · updated September 24, 2026
- Lane closureboth directions
Bridge construction: Six Mile Bridge
Since Thu, Sep 24, 11:08 a.m. PDT
Bridge construction at Highway 5, At Six Mile Bridge. Starting Thu Sep 24 until Fri Nov 27. Single lane alternating traffic. Watch for traffic control. Width restriction: 3.8m. Weight vehicle restriction: 85T. Lane width reduction to 3.8 m wide lane, with a max 4.4 m width including overhang. In addition, a maximum weight restriction of 85T.
DriveBC · BC · updated 3 days ago
- Lane closureboth directions
Road construction: Thunder River Road to Miledge Creek Bridge
Since Thu, Sep 24, 10:58 a.m. PDT
Road construction from Highway 5, At Thunder River Road to At Miledge Creek Bridge. Starting Thu Sep 24 until Sat Nov 7. From 8:00 AM to 5:00 PM PDT, weekdays. Watch for traffic control. Single Lane Alternating Traffic will only be required for a brief duration during mobilization and demobilization of materials and equipment.
DriveBC · BC · updated September 24, 2026
Coquihalla Highway (Hwy 5) by email, every morning
Collisions, winter road conditions and closures on Coquihalla Highway (Hwy 5) at 6:00 a.m. Eastern. Free, and one click to stop.
More options: more highways, provinces, or Mondays only.
What we cover in British Columbia
- Construction and lane closuresLive · 511 Alberta, DriveBC, City open data (Toronto, Vancouver, Calgary)
- Collisions and incidentsLive · 511 Alberta, DriveBC, City open data (Toronto, Vancouver, Calgary)
- Winter road conditionsLive · 511 Alberta, DriveBC, City open data (Toronto, Vancouver, Calgary)