Construction
Highway construction
Construction and lane closures on highways, from the provincial 511s. 630 in progress now in 4 provinces; the most serious are listed first, and every one is on its highway's page and the live map.
In progress now 630
- Autoroute 40Full closurewestbound
Westbound, exits 96-O and 96-E (A-640) are closed, A-40
Until Tue, Oct 13, 4:30 a.m. EDT
Road resurfacing · Between De La Rochelle Boulevard in Repentigny and Highway 640 in Charlemagne · Highway closed WESTBOUND, two-way traffic on the opposite roadway · WESTBOUND, exits 96-O and 96-E (A-640) are closed · Friday between 11:59 p.m. and 8 a.m. the following day · Monday between 10:30 p.m. and 4:30 a.m. the following day · Detour: exit 94, Saint-Charles Road, Des Migrateurs Street
quebec511 · QC · updated 1 day ago
- Autoroute 10Full closure
Highway closed, A-10
Until Tue, Oct 13, 5:00 a.m. EDT
Structural repair · In Montreal, on the Bonaventure Expressway, between exit 4 (A-15, A-20) and the Samuel-De Champlain Bridge · EASTBOUND · Highway closed · Friday between 10 p.m. and 5 a.m. the following day · Saturday between 11 p.m. and 9 a.m. the following day · Sunday between 10 p.m. and 5 a.m. the following day · Detour via Boulevard Gaétan-Laberge and A-15 SOUTH. Towards Île des Sœurs, exit 57-N (Chemin de la Pointe-Nord)
quebec511 · QC · updated 1 day ago
- Route 132Full closure
Road closed at all times, In Longueuil, on Roland-Therrien Boulevard, between Auteuil Street and Route 132
Until Mon, Oct 12, 5:00 a.m. EDT
Structural repair · In Longueuil, on Roland-Therrien Boulevard, between Auteuil Street and Route 132 · NORTHBOUND · Road closed at all times · Detour via Geoffrion, Saint-Charles, Du Bord-de-l'Eau, and Joliette Streets
quebec511 · QC · updated 1 day ago
- Route 138Full closure
Pont fermé en direction Ouest, circulation à contresens sur la travée opposée, R-138
Until Mon, Oct 12, 9:00 p.m. EDT
Road resurfacing · Between Montreal and Repentigny, on the Jean-Baptiste-Le Gardeur Bridge · Bridge closed WESTBOUND, two-way traffic on the opposite roadway
quebec511 · QC · updated 2 days ago
- Autoroute 50Full closure
Highway closed, A-50
Until Thu, Oct 15, 8:00 a.m. EDT
Road maintenance · Between Route 344 in Grenville-sur-la-Rouge and Route 148 in Brownsburg-Chatham · In both directions · Highway closed · Sunday between 9 p.m. and 6 a.m. the following day · From Monday to Thursday between 7 p.m. and 6 a.m. the following day · Friday between 8:30 p.m. and 8:30 a.m. the following day · Detour R-148 · Lane width in each direction: 3.3 meters · ---- · No roadworks on the night of Monday, October 12 to Tuesday, October 13
quebec511 · QC · updated 2 days ago
- Autoroute 20Full closurewestbound
Road closed Westbound, contraflow traffic diverted to the opposite direction, A-20
Until Fri, Oct 23, 6:00 a.m. EDT
Asphalt · In Coteau-du-Lac, between km 17.5 and 16 · In both directions · Road closed WESTBOUND, contraflow traffic diverted to the opposite direction · From Monday to Friday between 9 p.m. to 6 a.m. the next day
quebec511 · QC · updated 2 days ago
- Autoroute 25Full closure
Highway closed, A-25
Until Tue, Oct 13, 5:00 a.m. EDT
Major renovation, Louis-Hippolyte-La Fontaine tunnel · Between Route 132 in Longueuil and Souligny Avenue in Montreal · NORTHBOUND · Highway closed · Saturday between 10 p.m. and 7 a.m. the following day · Sunday between 10 p.m. and 8 a.m. the following day · Monday between 10 p.m. and 5 a.m. the following day · Detour Exit 90, R-132 WEST, Jacques-Cartier Bridge, Notre-Dame Street · Heavy vehicles, height + 4.25 meters: Pie-IX Boulevard, Sherbrooke Street
quebec511 · QC · updated 2 days ago
- Route 138Full closureeastbound
Eastbound roadway closed, traffic diverted onto the roadway in the opposite direction, R-138
Until Wed, Oct 14, 6:00 a.m. EDT
Pavement repair · Between rue de l'Estran in Boischatel and côte Dufournel in L'Ange-Gardien · In both directions · EASTBOUND roadway closed, traffic diverted onto the roadway in the opposite direction · From Sunday to Thursday between 7 pm and 6 am the following day · Thursday, October 8 and Friday, October 9 between 7 pm and 6 am the following day · Monday, October 12 and Tuesday, October 13 between 7 pm and 6 am the following day · Lane width reduced to 3.5 metres
quebec511 · QC · updated 2 days ago
- Autoroute 25Full closure
Highway closed, A-25
Until Sun, Oct 11, 11:00 p.m. EDT
Major renovation, Louis-Hippolyte-La Fontaine tunnel · Between the Anjou interchange in Montreal and Route 132 in Longueuil, including the Louis-Hippolyte-La Fontaine tunnel · SOUTHBOUND · Highway closed · Detour: Access to A-40 WEST, Exit 66-S, A-15 SOUTH and Samuel-De-Champlain Bridge
quebec511 · QC · updated 2 days ago
- Autoroute 50Full closure
Highway closed, A-50
Until Tue, Oct 13, 5:00 a.m. EDT
Road resurfacing · In Gatineau, between Lorrain Boulevard and Paiement Hill · Heading WEST · Highway closed · Labrosse Boulevard access closed · Thursday and Monday between 7 p.m. and 5 a.m. the following day · Detour Exit 150, R-366 SOUTH, R-148 WEST
quebec511 · QC · updated 3 days ago
- Route 327Full closure
Road closed, at all times, R-327
Until Fri, Oct 23, 5:00 p.m. EDT
Culvert reconstruction · In Brownsburg-Chatham, between De Nürnberg Street and Eupen Road · In both directions · Road closed, at all times · Detour: Édina, De Kerpen Roads
quebec511 · QC · updated 3 days ago
- Autoroute 520Full closure
Chaussée fermée en direction Sud et circulation à contresens sur la chaussée opposée en tout temps, A-520
Until Fri, Dec 18, 11:59 p.m. EST
Reconstruction of the Cavendish Boulevard overpass · In Montreal, Cavendish Boulevard, at the A-520 interchange · Road closed southbound and contraflow traffic on the opposite carriageway at all times
quebec511 · QC · updated 4 days ago
- Route 170Full closure
Lane width reduced to 3.4 meters, R-170
Until Fri, Oct 30, 11:59 p.m. EDT
Public utilities · In Saguenay (La Baie), between Rue Bagot and Chemin des Chutes · Roadway closed WESTBOUND, contraflow traffic on the opposite roadway at all times · Lane width reduced to 3.4 meters
quebec511 · QC · updated 4 days ago
- Autoroute 520Full closure
Roads closed at all times, A-520
Until Mon, Nov 30, 11:59 p.m. EST
Reconstruction of the Cavendish Boulevard overpass · In Montreal, the service roads, at the level of Cavendish Boulevard · In both directions · Roads closed at all times · Detour · EASTBOUND: Barr Street, A-520 EAST, Exit 7, Delmeade Road · WESTBOUND: Isabey Street, A-40 EAST service road, A-520 WEST, exit 5
quebec511 · QC · updated 4 days ago
- Route 132Full closure
Fermeture, R-132
Since Wed, Oct 7, 9:39 a.m. EDT
R-132 entre avenue de Louisbourg et avenue Godefroy · Direction: OUEST et EST · Cause: Événements spéciaux · Détour: Avenue Godefroy · Durée: Du 11 octobre 2026 à 7 h au 11 octobre 2026 à 13 h
quebec511 · QC · updated 4 days ago
- Route 358Full closure
Lane width reduced to 3.1 meters, R-358
Until Fri, Nov 6, 11:59 p.m. EST
Bridge repair · In Québec, boulevard Chauveau, at A-573 · Road closed EASTBOUND, contraflow traffic in the opposite roadway at all times · Lane width reduced to 3.1 meters
quebec511 · QC · updated 5 days ago
- Route 340Full closure
Road Closed, R-340
Until Sat, Oct 17, 11:59 p.m. EDT
Culvert repair · Between the Saint-Emmanuel Road in Saint-Clet and the Saint-Dominique Road in Les Cèdres · In both directions · Road Closed · Detour · Light vehicles: Poirier Road, Sainte-Angélique Road, Saint-Robert Road · Heavy vehicles: R-201, A-20, A-30, A-40
quebec511 · QC · updated 6 days ago
- Route 361Full closure
Road closed at all times, R-361
Until Fri, Nov 20, 11:59 p.m. EST
Road repairs · In Sainte-Geneviève-de-Batiscan, between Rang du Village-Champlain and Chemin Campanipol · In both directions · Road closed at all times · Detour: Rang du Village-Champlain, Chemin Campanipol
quebec511 · QC · updated September 29, 2026
- Route 341Full closure
Road closed at all times, R-341
Until Mon, Nov 30, 5:30 a.m. EST
Redevelopment, public services · In L'Épiphanie, between Rue Saint-Germain and Rang de l'Achigan Sud · NORTHBOUND · Road closed at all times · Detour · Light vehicles: Chemin des Commissaires, R-339 · Heavy vehicles: R-339 SOUTH, R-341 SOUTH, A-40 WEST (exit 96-W) or A-40 EAST (exit 122) · Lane width (SOUTHBOUND) reduced to 3.7 meters
quebec511 · QC · updated September 29, 2026
- Route 363Full closure
Road closed at all times, R-363
Until Fri, Oct 30, 11:59 p.m. EDT
Road resurfacing · In Saint-Ubalde, between Rue des Érables and Rue Saint-Philippe · In both directions · Road closed at all times · Detour: Rue Saint-Philippe, rue Saint-Paul, rue Rompré, rue du Moulin, temporary detour path
quebec511 · QC · updated September 29, 2026
- Autoroute 30Full closureeastbound
Highway closed Eastbound, contraflow traffic on the opposite direction at all times, A-30
Until Fri, Oct 30, 5:00 a.m. EDT
Structural repair · In Varennes, between the De Picardie and Du Lac Ascents · In both directions · Highway closed EASTBOUND, contraflow traffic on the opposite direction at all times
quebec511 · QC · updated September 23, 2026
- Route 207Full closure
Road closed at all times, R-207
Until Fri, Oct 30, 11:00 p.m. EDT
Public services · In Saint-Isidore, rang Saint-Regis S, between R-221 and Prud'homme hill · In both directions · Road closed at all times · Light Vehicle Detour: Saint-Régis North Road, Prud'homme Hill, Saint-Rémi Road, Saint-Rémi Hill · Heavy vehicles: Saint-Régis Road, Boyer Street, Saint-Isidore Hill, Sainte-Marguerite Boulevard
quebec511 · QC · updated September 23, 2026
- Autoroute 55Full closure
Monday and Tuesday between 7:30 p.m
Until Fri, Oct 16, 6:00 a.m. EDT
Maintenance · Between Trois-Rivières and Bécancour, on pont Laviolette · Road closed SOUTHBOUND, contraflow traffic on the opposite roadway · Monday and Tuesday between 7:30 p.m. and 6:30 a.m. the next day · Road closed NORTHBOUND, contraflow traffic on the opposite roadway · Wednesday and Thursday between 7:30 p.m. and 6 a.m. the next day · Lane width reduced to 3.2 meters
quebec511 · QC · updated September 23, 2026
- Route 223Full closure
Road closed at all times, In Saint-Antoine-sur-Richelieu, on Chemin de la Pomme-d'Or, between Route 223 and…
Until Wed, Nov 4, 5:00 p.m. EST
Public services · In Saint-Antoine-sur-Richelieu, on Chemin de la Pomme-d'Or, between Route 223 and Rang de l'Acadie · EASTBOUND · Road closed at all times · Detour · Light vehicles : rue du Moulin-Payet, rue Larose, rue Réjean. · Heavy vehicles : Acadie road, Monseigneur-Gravel road, R-223.
quebec511 · QC · updated September 21, 2026
- Route 175 (parc des Laurentides)Full closure
Chaussée fermée en direction Nord, circulation à contresens sur la chaussée opposée (1 voie par direction) en…
Until Tue, Nov 10, 11:59 p.m. EST
Bridge repair · In Lévis, between Boulevard du Centre-Hospitalier and Rue de la Concorde · Road closed NORTHBOUND, contraflow traffic on the opposite roadway (1 lane per direction) at all times
quebec511 · QC · updated September 18, 2026
- Autoroute 55Full closure
Road closed at all times, A-55
Until Fri, Oct 23, 11:59 p.m. EDT
Structural repair · In Shawinigan, 15e Rue, at A-55, between Avenue du Bocage and 17e Rue · In both directions · Road closed at all times · Detour: Avenue du Bocage, 25e Rue, 10e Avenue
quebec511 · QC · updated September 16, 2026
- Route 348Full closure
Road Closed, R-348
Until Fri, Oct 30, 6:00 p.m. EDT
Reconstruction of a culvert · In Saint-Félix-de-Valois, between Route 131 and the Saint-Gabriel Road · In both directions · Road Closed · Detour R-131
quebec511 · QC · updated September 9, 2026
- Route 116Full closure
Road closed at all times, R-116
Until Fri, Nov 6, 11:59 p.m. EST
Refurbishment of municipal services · In Acton Vale on Acton Street between Robin and Roxton Streets (R-139) · In both directions · Road closed at all times · Detour · Light véhicles : Bonin Street, Marc-Aurèle Street, R-139. · Heavy vehicles : MacDonald Road, 2nd Range, R-139.
quebec511 · QC · updated September 9, 2026
- Route 205Full closure
Road closed at all times, R-205
Until Sun, Nov 22, 11:59 p.m. EST
Road reconstruction · In Sainte-Clotilde, 3e Rang, between the Montée Hébert and the Chemin Back Bush · In both directions · Road closed at all times · Detour via Montée Hébert, Montée du 4ème rang, Chemin Back Bush
quebec511 · QC · updated August 30, 2026
- Route 209Full closure
Detour Rang Saint-Pierre Nord, R-209
Until Fri, Dec 11, 11:59 p.m. EST
Bridge reconstruction · In Saint-Constant, between the access points of the Saint-Pierre Nord road · Road Closed · Detour Rang Saint-Pierre Nord
quebec511 · QC · updated August 28, 2026
- Route 132Full closurewestbound
Road closed Westbound, contraflow traffic in the opposite direction at all times, R-132
Until Tue, Dec 1, 10:00 p.m. EST
Structural reconstruction · In Beauharnois, on Melocheville Boulevard, between the exit to Principale Street and Sainte-Marie Road · In both directions · Road closed WESTBOUND, contraflow traffic in the opposite direction at all times · Lane width reduced to 3.5 meters each
quebec511 · QC · updated August 20, 2026
- Autoroute 35Full closuresouthbound
Road closed Southbound, contraflow traffic on the opposite direction at all times, A-35
Until Sat, Oct 31, 6:00 a.m. EDT
Reconstruction · In Saint-Jean-sur-Richelieu, between exit 39 (R-104) and R-104 · In both directions · Road closed SOUTHBOUND, contraflow traffic on the opposite direction at all times
quebec511 · QC · updated August 17, 2026
- Autoroute 50Full closureeastbound
Eastbound: closure of Exit 166 (R-315), A-50
Until Tue, Dec 1, 5:00 a.m. EST
Bridge reconstruction · In Gatineau, between km 161 and 167 · Highway closed EASTBOUND, contraflow traffic to the opposite carriageway, at all times · EASTBOUND: closure of Exit 166 (R-315) · Detour: Exit 171, Lépine and De Buckingham Avenues
quebec511 · QC · updated August 4, 2026
- Route 397Full closure
Fermeture, R-397
Since Fri, Jul 24, 1:49 p.m. EDT
R-397 à la hauteur rivière Laflamme · Direction: SUD et NORD · Cause: Bris de la structure · Détour: R-113, R-386 · Durée: Indéterminée
quebec511 · QC · updated July 24, 2026
- Route 132Full closure
Complete closure, at all times, R-132
Until Thu, Dec 31, 11:59 p.m. EST
Refurbishment of structures · In Salaberry-de-Valleyfield, Hébert Boulevard, between Léger and Masson Streets · In both directions · Complete closure, at all times · Detour via rue Masson et rue léger
quebec511 · QC · updated July 6, 2026
- Route 321Full closure
road closed at all times, R-321
Until May 17, 2027, 11:59 p.m. EDT
Bridge replacement · In Saint-André-Avellin, on Main Street, between Séguin and Lanthier Streets · In both directions · road closed at all times · Detour via Séguin, Charron and Lanthier streets (temporary bridges). Detours via Routes 317 and 323. · Truck detour: A-50, R-323 and 317.
quebec511 · QC · updated June 17, 2026
- Autoroute 20Full closurewestbound
Westbound: lane width reduced to 3.65 meters, A-20
Until Mon, Nov 16, 11:59 p.m. EST
Bridge repair · Between km 448 in Rivière-Ouelle and km 451 in Saint-Pacôme · Road closed WESTBOUND, contraflow traffic on the opposite roadway (1 lane per direction) at all times · WESTBOUND: lane width reduced to 3.65 meters · EASTBOUND: lane width reduced to 5 meters
quebec511 · QC · updated May 11, 2026
- Route 136Full closure
Road closed at all times, In Montreal, on Saint-Urbain Street, above Route 136 (Ville-Marie Highway)
Until Thu, Dec 31, 5:00 a.m. EST
Refurbishment of the overpass on Saint-Urbain Street · In Montreal, on Saint-Urbain Street, above Route 136 (Ville-Marie Highway) · In both directions · Road closed at all times · Detour via Boulevard Saint-Laurent or Place Jean-Paul-Riopelle
quebec511 · QC · updated April 22, 2026
- Autoroute 25Full closurenorthbound
Northbound tunnel closed, contraflow traffic in the Southbound tunnel, at all times, A-25
Until Thu, Dec 31, 11:59 p.m. EST
Refurbishment of structures · Between Longueuil and Montreal, the Louis-Hippolyte-La Fontaine Tunnel · In both directions · NORTHBOUND tunnel closed, contraflow traffic in the SOUTHBOUND tunnel, at all times · Clearance height: 4.3 meters
quebec511 · QC · updated April 1, 2026
- Route 132Full closure
Lanes width reduced to 3.5 meters, R-132
Until Fri, Oct 16, 11:59 p.m. EDT
Road redevelopment · In Lévis, between boulevard Alphonse-Desjardins and rue Saint-Omer · Road closed EASTBOUND, traffic diverted to the opposite direction at all times · Lanes width reduced to 3.5 meters
quebec511 · QC · updated March 23, 2026
- Autoroute 440Lane closure
Fermeture de 1 voie sur 3, A-440
Since Sun, Oct 11, 2:06 p.m. EDT
A-440 à la hauteur R-117 · Direction: OUEST · Cause: Incident · Durée: Indéterminée
quebec511 · QC · updated 1 hr ago
- Alberta Highway 41Full closure
Highway 41 just northeast of Highway 29, near Elk Point - CLOSED for paving until October 29
Until Thu, Oct 29, 7:00 p.m. MDT
Highway 41 just northeast of Highway 29, near Elk Point - CLOSED for paving until October 29. Detour available via Highways 29, 881, and 28. · Paving operations on HWY-41 Both Directions 0.75 Km North of HWY-29. All lanes closed. Width Restriction: 2.3m Activities: Road Closed, Local road detour, Expect traffic delays Additional Restrictions: No Oversized Loads
511 Alberta · AB · updated 12 hr ago
- Alberta Highway 837Full closure
Highway 837 north of the junction with Highway 575, northwest of Drumheller - CLOSED until further notice
Until Wed, Oct 14, 6:00 p.m. MDT
Highway 837 north of the junction with Highway 575, northwest of Drumheller - CLOSED until further notice. Use alternate routes. · Traffic advisory on HWY-837 Both Directions Near HWY-575. All lanes closed. Activities: Road Closed, Use alternate route, Expect traffic delays
511 Alberta · AB · updated 12 hr ago
- Alberta Highway 6Full closure
Chief Mountain Border Crossing located on Highway 6 near Waterton Lakes National Park - CLOSED for the season until May 2027
Until May 15, 2027, 6:00 p.m. MDT
Chief Mountain Border Crossing located on Highway 6 near Waterton Lakes National Park - CLOSED for the season until May 2027. · General Information on HWY-6 Near Alberta Canada Montana United States Border. All lanes closed. Activities: Follow Directions
511 Alberta · AB · updated 12 hr ago
- Alberta Highway 717Full closure
Highway 717, south of Township Road 834, 3 km northeast of Cherry Point - bridge culvert replacement, September 30 to October 15
Until Thu, Oct 15, 7:00 p.m. MDT
Highway 717, south of Township Road 834, 3 km northeast of Cherry Point - bridge culvert replacement, September 30 to October 15. Expect road and bridge closure, use local road detour. · Culvert repair on HWY-717 Both Directions Near HWY-717. Activities: Road Closed, Local road detour, Bridge closed
511 Alberta · AB · updated 12 hr ago
- Alberta Highway 28Full closure
Highway 28 between the junction with Highway 41 and Highway 659, Bonnyville - concrete repairs, traffic signal installation, and…
Until Sep 15, 2027, 7:00 p.m. MDT
Highway 28 between the junction with Highway 41 and Highway 659, Bonnyville - concrete repairs, traffic signal installation, and catch basin work, September 15 to October of 2027. Expect lane closures and speed reductions in the area. Road closures with on-site detours will be set up as required. · Construction Work on HWY-28 Both Directions from HWY-41 to HWY-659 . Speed Restriction: 50km/hr Activities: Road Closed, Lane closure, Sidewalk closed, No passing, Speed reduction, Narrow lane, Pavement drop-off, Flag persons, Be prepared to stop, Local road detour, One lane travel
511 Alberta · AB · updated 12 hr ago
- Alberta Highway 2Full closure
Highway 2 at the Peace River - bridge maintenance operations, in progress until September 15, 2027, 24 hours/daily
Until Sep 15, 2027, 6:00 p.m. MDT
Highway 2 at the Peace River - bridge maintenance operations, in progress until September 15, 2027, 24 hours/daily. On-site detour is in place with a speed reduction to 50 km/h. Two-way traffic will be detoured on the westbound bridge. Expect temporary bridge closures for up to 1 hour during night surveying operations controlled by temporary traffic lights. Please follow posted directions. · Bridge maintenance operations on HWY-2 Both Directions Near Peace River. Speed Restriction: 50km/hr Activities: Road Closed, Lane closure, One - lane alt traffic, Speed reduction, Temp traffic signals, Fl
511 Alberta · AB · updated 12 hr ago
- Alberta Highway 93AFull closure
Closed: Moab Lake Road, Hwy 93A to Moab Lake
Since Sat, Oct 10, 11:21 a.m. MDT
Closed: Moab Lake Road, Hwy 93A to Moab Lake. Area: JASPER.
511 Alberta · AB · updated 1 day ago
- Alberta Highway 93AFull closure
Closed: Cavell Road, Jct Hwy 93A to Trailhead
Since Sat, Oct 10, 11:20 a.m. MDT
Closed: Cavell Road, Jct Hwy 93A to Trailhead. Area: JASPER.
511 Alberta · AB · updated 1 day ago
- Route 221Lane closure
Alternating traffic, R-221
Until Sat, Nov 14, 4:00 p.m. EST
Planing and asphalting · In Lacolle, between Route 202 and Richelieu Street · In both directions · Alternating traffic · Monday to Friday between 7 a.m. and 6 p.m. · Lane width reduced to 3.5 meters
quebec511 · QC · updated 1 day ago
- Route 202Lane closure
Alternating traffic, R-202
Until Sat, Nov 14, 4:00 p.m. EST
Planing and asphalting · In Lacolle, on Richelieu Street, between Church Street South and Parc-Industrial Street · In both directions · Alternating traffic · Monday to Friday between 6 a.m. and 6 p.m. · Lane width reduced to 3.5 meters
quebec511 · QC · updated 1 day ago
- Autoroute 20Lane closure
Access closed, A-20
Until Tue, Oct 13, 5:00 a.m. EDT
Road resurfacing · In Brossard, Route 132 WEST towards Highway 10 EAST · WESTBOUND · Access closed · Friday between 10 p.m. and 7 a.m. the following day · Monday between 10 p.m. and 5 a.m. the following day · Detour: De Rome Boulevard, Marie-Victorin Boulevard EAST
quebec511 · QC · updated 1 day ago
- Autoroute 15Lane closure
Exit closed, A-15
Until Tue, Oct 13, 5:00 a.m. EDT
Road reconfiguration · In Blainville, the exit 25 (De la Seigneurie Boulevard) · SOUTHBOUND · Exit closed · Friday between 11 p.m. and 7 a.m. the following day · Monday between 10:30 p.m. and 5 a.m. the following day · Detour Exit 23, Saint-Charles Street, A-15 NORTH
quebec511 · QC · updated 1 day ago
- Route 202Lane closure
Alternating traffic, R-202
Until Sat, Nov 14, 4:00 p.m. EST
Planing and asphalting · In Saint-Bernard-de-Lacolle, between Bogton Road and Highway 15 · In both directions · Alternating traffic · Monday to Friday between 6 a.m. and 6 p.m. · Lane width reduced to 3.5 meters
quebec511 · QC · updated 1 day ago
- Route 169Lane closure
Traffic on a narrowed lane of 3.2 meters at all times, R-169
Until Oct 31, 2027, 11:59 p.m. EDT
Bridge repair · Between Chemin du Domaine-Norois in Chambord and 4e Avenue in Desbiens · In both directions · Traffic on a narrowed lane of 3.2 meters at all times · Monday, October 12, between 7 p.m. and 5:30 a.m. the next day · Alternating traffic · Starting October 15 at 10 p.m.: · Alternating traffic at all times · Lane width reduced to 4.5 meters
quebec511 · QC · updated 1 day ago
- Autoroute 20Lane closure
Traffic on diverted lanes at all times, A-20
Until Jun 15, 2027, 11:59 p.m. EDT
Structure repair · In Notre-Dame-du-Bon-Conseil, on rivière Nicolet Sud-Ouest bridge · In both directions · Traffic on diverted lanes at all times
quebec511 · QC · updated 1 day ago
- Autoroute 20Lane closure
Exit closed, A-20
Until Fri, Oct 23, 6:00 a.m. EDT
Asphalt · At Coteau-du-Lac, exit 17 (R-201) · WESTBOUND · Exit closed · From Monday to Friday between 9 p.m. and 6 a.m. the following day · Detour A-20 West, Exit 14 (Monseigneur-Langlois Boulevard), R-201), R-338
quebec511 · QC · updated 2 days ago
- Autoroute 20Lane closure
Access closed, A-20
Until Fri, Oct 23, 6:00 a.m. EDT
Asphalt · In Coteau-du-Lac, access from Chemin Saint-Emmanuel to A-20 West · WESTBOUND · Access closed · From Monday to Friday between 9 p.m. and 6 a.m. the following day · Detour A-20 East, exit 22 (Saint-Dominique Road), A-20 West
quebec511 · QC · updated 2 days ago
- Autoroute 40Lane closure
Between 0:01 and 10:00, A-40
Until Thu, Dec 31, 5:00 a.m. EST
Maintenance and reconstruction of a new bridge · Between Vaudreuil-Dorion and Senneville, on De l'Île-aux-Tourtes bridge · In both directions · Between 0:01 and 10:00 · 3 lanes, heading towards Montreal (EAST) and 2 lanes heading towards Vaudreuil-Dorion (WEST) · Between noon and 10 p.m. · 3 lanes towards Vaudreuil-Dorion (WEST) and 2 lanes towards Montreal (EAST) · Maintaining optimal configuration in the WEST during weekends and holidays · At all times: · Heavy vehicles are prohibited from using the right-hand lane · Overloaded vehicles are prohibited.
quebec511 · QC · updated 2 days ago
- Autoroute 40Lane closure
Closure of access, A-40
Until Thu, Oct 15, 6:00 a.m. EDT
Asphalting · In Québec, access from avenue Jules-Verne (route Jean-Gauvin) · WESTBOUND · Closure of access · Friday between 7 pm and 6 am the next day · Monday between 9 pm and 6 am the next day · Tuesday and Wednesday between 10 pm and 6 am the next day · Detour: R-138 (boulevard Wilfrid-Hamel)
quebec511 · QC · updated 2 days ago
- Route 132Lane closure
Alternating traffic at all times, R-132
Until Sun, Oct 11, 11:59 p.m. EDT
Bridge reconstruction (completion) · Between Chemin de la Plage-Poisson in Saint-Pierre-les-Becquets and Route Courteau in Deschaillons-sur-Saint-Laurent · In both directions · Alternating traffic at all times
quebec511 · QC · updated 2 days ago
- Autoroute 20Lane closureeastbound
Road closed Eastbound, contraflow traffic on the opposite roadway, A-20
Until Fri, Oct 23, 5:30 p.m. EDT
Asphalting · Between Rue Principale in Saint-Pierre-de-la-Rivière-du-Sud and Chemin des Poirier in Montmagny · In both directions · Until October 16: · Road closed EASTBOUND, contraflow traffic on the opposite roadway · Continuously, from Tuesday at 7 a.m. to Friday at 5:30 p.m. · From October 16 to October 19: · Closure of 1 out of 2 lanes · Continuously, from Friday at 5:30 p.m. to Monday at 7 a.m.
quebec511 · QC · updated 2 days ago
- Route 138Lane closure
Alternating traffic at all times, R-138
Until Fri, Oct 16, 11:59 p.m. EDT
Pavement repair · In Sept-Îles, between Rue des Menuisiers and Rue de l'Administration · In both directions · Alternating traffic at all times
quebec511 · QC · updated 2 days ago
- Route 138Lane closure
Closure of 1 lane out of 2 at all times, R-138
Until Mon, Oct 12, 11:59 p.m. EDT
Pavement repair · In Sept-Îles, between Rue des Pionniers and Rue des Soudeurs · In both directions · Closure of 1 lane out of 2 at all times · Lane width reduced to 3.5 meters
quebec511 · QC · updated 2 days ago
- Route 281Lane closure
Alternating traffic at all times, R-281
Until Thu, Oct 22, 5:00 p.m. EDT
Bridge reconstruction · In Saint-Raphaël, on rivière Bras Saint-Michel bridge · In both directions · Alternating traffic at all times
quebec511 · QC · updated 2 days ago
- Route 132Lane closure
Access closed, R-132
Until Tue, Oct 13, 5:00 a.m. EDT
Major renovation, Louis-Hippolyte-La Fontaine tunnel · In Longueuil, access to Highway 25 North · WESTBOUND · Access closed · Friday between 10:30 p.m. and 8:00 a.m. the following day · Saturday between 9:30 p.m. and 7:00 a.m. the following day · Sunday between 9:30 p.m. and 8:00 a.m. the following day · Monday between 9 p.m. and 5 a.m. the following day · Detour R-132 WEST, exit 82, Jacques-Cartier bridge, Notre-Dame street
quebec511 · QC · updated 2 days ago
- Autoroute 20Lane closure
Access closed continuously, A-20
Until Tue, Oct 13, 5:00 a.m. EDT
Major renovation, Louis-Hippolyte-La Fontaine tunnel · In Longueuil, towards A-25 NORTH, tunnel · EASTBOUND · Access closed continuously · Friday between 9:30 p.m. and 8:00 a.m. the following day · Saturday between 9:30 p.m. and 7:00 a.m. the following day · Sunday between 9:30 p.m. and 8:00 a.m. the following day · Monday between 9:30 p.m. and 5:00 a.m. the following day · Detour Exit 137, De Montarville Boulevard, R-132 WEST, Jacques-Cartier Bridge
quebec511 · QC · updated 2 days ago
- Autoroute 40Lane closure
Access closed, A-40
Until Sun, Oct 11, 11:00 p.m. EDT
Major renovation, Louis-Hippolyte-La Fontaine Tunnel · In Montreal, Metropolitan Highway, access from Stinson Street · WESTBOUND · Access closed · Detour: West service road, Liesse roundabout (A-520), East service road and A-15 South (Décarie)
quebec511 · QC · updated 2 days ago
- Autoroute 40Lane closure
Exit closed at all times, A-40
Until Thu, Oct 15, 5:00 a.m. EDT
Bridge repair · In Quebec City, exit 322 (boulevard des Chutes) · WESTBOUND · Exit closed at all times · Detour: exit 321 (boulevard Raymond, rue Labelle), rue Yves-Prévost, A-40 EAST
quebec511 · QC · updated 2 days ago
- Autoroute 40Lane closure
Access closed, A-40
Until Sun, Oct 11, 11:00 p.m. EDT
Major renovation, Louis-Hippolyte-La Fontaine tunnel · In Montreal, at the Anjou interchange, access to Highway 25 South (80-S) · WESTBOUND · Access closed · Detour A-40 WEST and A-15 SOUTH
quebec511 · QC · updated 2 days ago
- Autoroute 40Lane closure
Access closed, A-40
Until Sun, Oct 11, 11:00 p.m. EDT
Major renovation, Louis-Hippolyte-La Fontaine tunnel · In Montreal, at the Anjou interchange, access to Highway 25 South (80-S) · EASTBOUND · Access closed · Detour A-40 EAST, exit 85, Bourget Boulevard, service road and A-40 WEST, A-15 SOUTH
quebec511 · QC · updated 2 days ago
- Route 307Lane closure
Counterflow traffic, R-307
Until Thu, Oct 15, 6:00 p.m. EDT
Road maintenance · In Bowman, between Cheslock Road and Thibault Road · In both directions · Counterflow traffic · Monday to Friday between 7 a.m. and 6 p.m.
quebec511 · QC · updated 3 days ago
- Route 175 (parc des Laurentides)Lane closure
Exit closed at all times, R-175
Until Fri, Nov 6, 11:59 p.m. EST
Road redevelopment · In Quebec City, exit 23 (chemin Saint-Louis) · NORTHBOUND · Exit closed at all times · Detour: boulevard Laurier interchange
quebec511 · QC · updated 3 days ago
- British Columbia Highway 1Full closureboth directions
Construction work: Sicamous and Old Sicamous Road to Sicamous and Solsqua-Sicamous Road
Since Thu, Aug 6, 11:31 a.m. PDT
Construction work from Highway 1, In Sicamous and Old Sicamous Road to In Sicamous and Solsqua-Sicamous Road. Starting Wed Aug 19. Watch for traffic control. Road Closed 9AM-3PM PT Mon-Sat. No closure from 12PM Fri Oct 9 - 12PM Tues Oct 13. Alternate routes Highway 97A and 97B. Single lane alternating traffic Mon-Sat 8PM-6AM. Local access to Old Sicamous Rd/Old Spallumcheen Rd at top of hour during closure. No thru-traffic.
DriveBC · BC · updated 4 days ago
- Route 138Lane closure
Alternating traffic at all times, R-138
Until Thu, Oct 15, 11:59 p.m. EDT
Bridge repair · In Colombier, on rivière Betsiamites bridge · In both directions · Alternating traffic at all times · Lane width reduced to 3.3 meters
quebec511 · QC · updated 4 days ago
- Route 363Lane closure
Alternating traffic at all times, R-363
Until Mon, Nov 23, 11:59 p.m. EST
Bridge repair · In Deschambault-Grondines, at A-40 · In both directions · Alternating traffic at all times · Lane width reduced to 5 metres
quebec511 · QC · updated 4 days ago
- Autoroute 20Lane closure
Traffic on diverted lanes at all times, A-20
Until Mon, Nov 9, 5:00 a.m. EST
Road redevelopment · In Lévis, between R-175 and rivière Etchemin · EASTBOUND · Traffic on diverted lanes at all times · WESTBOUND · Traffic of 1 lane out of 2 (left lane) diverted on the opposite roadway at all times
quebec511 · QC · updated 4 days ago
- Autoroute 40Lane closure
Closure of 1 lane out of 3 at all times, A-40
Until Sun, Nov 15, 11:59 p.m. EST
Bridge repair · In Trois-Rivières, between Rue Laviolette and Rue Sainte-Marguerite · WESTBOUND · Closure of 1 lane out of 3 at all times · Lane width reduced to 3.2 meters and 3 meters
quebec511 · QC · updated 4 days ago
- Autoroute 10Lane closure
Closure of 1 out of 2 lanes, A-10
Until Fri, Oct 23, 6:00 p.m. EDT
Drilling · In Shefford, on both sides of Foster Road · In both directions · Closure of 1 out of 2 lanes · Monday to Friday between 7 a.m. and 6 p.m.
quebec511 · QC · updated 5 days ago
- Route 360Lane closure
Closure of 1 lane out of 2 at all times., R-360
Until Fri, Oct 16, 11:59 p.m. EDT
Maintenance · In Beaupré, on both sides of rue du Beau-Mont · In both directions: · Closure of 1 lane out of 2 at all times. · EASTBOUND: · Left-turn lanes closed at all times
quebec511 · QC · updated 6 days ago
- Autoroute 40Lane closure
Closure of 1 lane out of 2 at all times, A-40
Until Mon, Nov 23, 11:59 p.m. EST
Bridge repair · In Deschambault-Grondines, at R-363 · WESTBOUND · Closure of 1 lane out of 2 at all times
quebec511 · QC · updated 6 days ago
- Route 138Lane closure
Alternating traffic between midnight and 7 a.m., between 12 p.m
Until Sat, Nov 7, 12:59 a.m. AST
Road redevelopment · At Tête-à-la-Baleine, WEST of the wharf · In both directions · From September 22 to October 9 and from October 19 to November 6: · From Sunday to Wednesday: · Alternating traffic between midnight and 7 a.m., between 12 p.m. and 1 p.m., and between 5 p.m. and 11:59 p.m. · ROAD CLOSED between 7am and 12pm and between 1pm and 5pm · THURSDAY : · Alternating traffic between midnight and 11:59 PM · Friday : · Alternating traffic between midnight and 12 p.m. and between 5 p.m. and 11:59 p.m. · ROAD CLOSED between 12pm and 5pm · SATURDAY : · Alternating traffic between midnight an
quebec511 · QC · updated 6 days ago
- Route 117Lane closure
Closure of 1 out of 2 lanes at all times, R-117
Until Sat, Nov 21, 5:00 a.m. EST
Public services, aqueduct · In Rosemère, near Highway 640 · In both directions · Closure of 1 out of 2 lanes at all times
quebec511 · QC · updated October 2, 2026
- Route 133Lane closure
Closure of 1 out of 2 lanes at all times, R-133
Until Thu, Oct 15, 4:00 p.m. EDT
Road redevelopment · In Saint-Armand, between Montgomery Avenue and Allan Street · In both directions · Closure of 1 out of 2 lanes at all times
quebec511 · QC · updated October 2, 2026
- Route 218Lane closure
Heavy vehicles are prohibited at all times, R-218
Until Tue, Oct 13, 11:59 p.m. EDT
Traffic management element · Between R-269 in Saint-Gilles and Chemin Iberville in Saint-Lambert-de-Lauzon · In both directions · Heavy vehicles are prohibited at all times · Detour for trucks: Chemin Iberville, Rue Saint-Michel, Rue Principale, Rang Sainte-Anne, R-269
quebec511 · QC · updated October 1, 2026
- Route 381Lane closure
Lane width reduced to 4 meters, R-381
Until Fri, Nov 13, 11:59 p.m. EST
In Ferland-et-Boilleau, NORTH of Chemin Eddy-Morin · In both directions · Alternating traffic on a deviation route at all times · Lane width reduced to 4 meters
quebec511 · QC · updated October 1, 2026
- Route 138Lane closure
Alternating traffic, Monday to Friday between 7 am and 4:30 pm, R-138
Until Fri, Oct 16, 4:30 p.m. EDT
Public utilities · In Cap-Santé, between rue Cartier and chemin du Bois-de-l'Ail · In both directions · Alternating traffic, Monday to Friday between 7 am and 4:30 pm
quebec511 · QC · updated October 1, 2026
- Route 132Lane closure
Alternating traffic at all times, R-132
Until Fri, Oct 16, 11:59 p.m. EDT
Bridge repair · In Sainte-Angèle-de-Mérici, between R-234 and chemin de la Rivière-Mitis Nord · In both directions · Alternating traffic at all times
quebec511 · QC · updated October 1, 2026
- Route 230Lane closure
Alternating traffic, from Monday to Friday between 6 a.m
Until Fri, Oct 23, 7:00 p.m. EDT
Asphalting · In Saint-Pacôme, between Rue Saint-Alphonse and Rue du Parc-Industriel · In both directions · Alternating traffic, from Monday to Friday between 6 a.m. and 7 p.m. · Lane width reduced to 4 meters
quebec511 · QC · updated September 30, 2026
- Route 117Lane closure
Closure of 1 out of 2 lanes at all times, R-117
Until Tue, Oct 20, 11:59 p.m. EDT
Pipe replacement · In Sainte-Agathe-des-Monts, at the roundabout of Raymond and Desjardins Streets · In both directions · Closure of 1 out of 2 lanes at all times · Detour · Light vehicles: local network · Heavy vehicles: A-15 NORTH, exit 89 or A-15 SOUTH, exit 86 · Available lane width: 3.5 meters
quebec511 · QC · updated September 30, 2026
- Route 175 (parc des Laurentides)Lane closure
Closure of 1 lane out of 2 at all times, R-175
Until Fri, Oct 30, 11:59 p.m. EDT
Route redevelopment · In Québec, NORTH of Chemin Saint-Louis · NORTHBOUND · Closure of 1 lane out of 2 at all times · Lane width reduced to 5 meters
quebec511 · QC · updated September 30, 2026
- Route 132Lane closure
Alternating traffic, from Monday to Friday between 6:30 a.m
Until Fri, Oct 16, 6:00 p.m. EDT
Road resurfacing · In Amqui, between Rang Saint-Guillaume and Rue Thomas-Fréchette · In both directions · Alternating traffic, from Monday to Friday between 6:30 a.m. and 6 p.m.
quebec511 · QC · updated September 30, 2026
- Route 132Lane closure
Alternating traffic, from Monday to Thursday between 6 am and 6 pm, R-132
Until Thu, Oct 15, 6:00 p.m. EDT
Bridge repair · In New Richmond, on the rivière Cascapédia bridge · In both directions · Alternating traffic, from Monday to Thursday between 6 am and 6 pm
quebec511 · QC · updated September 28, 2026
- Route 132Lane closure
Traffic on a narrowed lane of 3.65 meters, from Monday to Friday at all times, R-132
Until Fri, Oct 16, 11:59 p.m. EDT
Public utilities · In Matane, between Route de la Gouèche and Chemin de la Grève · EASTBOUND · Traffic on a narrowed lane of 3.65 meters, from Monday to Friday at all times · WESTBOUND · Traffic on a diverted lane, from Monday to Friday at all times
quebec511 · QC · updated September 28, 2026
- Route 234Lane closure
Alternating traffic, R-234
Until Fri, Oct 16, 6:00 p.m. EDT
Asphalt · In Price, between Georges-A.-Joubert Street and Mitis Street · In both directions · Alternating traffic · Monday to Friday between 7 a.m. and 6 p.m. · Lane width reduced to 3.65 meters · Detour for vehicles over 3.65 meters wide: R-132, Avenue des Fusiliers
quebec511 · QC · updated September 24, 2026
- Route 359Lane closure
Alternating traffic at all times, R-359
Until Fri, Oct 16, 5:00 p.m. EDT
Public utilities · In Champlain, between R-138 and Rue Massicotte · In both directions · Alternating traffic at all times
quebec511 · QC · updated September 23, 2026
- Autoroute 136Lane closure
Closure of 2 out of 4 lanes, at all times, A-136
Until Thu, Dec 31, 5:00 a.m. EST
Repair of the overpass on Saint-Urbain Street · In Montreal, in the Viger Tunnel, between Panet Street and Exit 5 (Robert-Bourassa Boulevard) · WESTBOUND · Closure of 2 out of 4 lanes, at all times
quebec511 · QC · updated September 23, 2026
- Autoroute 55Lane closure
Exit closed, A-55
Until Wed, Oct 14, 6:00 a.m. EDT
Maintenance · In Bécancour, exit 176 (A-30, R-132, Sainte-Angèle) · SOUTHBOUND · Exit closed · Monday and Tuesday between 7:30 p.m. and 6:30 a.m. the next day · Detour: A-30 WEST, Port-Royal Boulevard
quebec511 · QC · updated September 23, 2026
- Autoroute 55Lane closure
Access closed, In Bécancour, access from Godefroy Avenue, towards A-55 North
Until Fri, Oct 16, 6:00 a.m. EDT
Maintenance · In Bécancour, access from Godefroy Avenue, towards A-55 NORTH · In both directions · Access closed · Wednesday and Thursday between 7:30 p.m. and 6:00 a.m. the next day · Detour: Boulevard Bécancour, Boulevard de Port-Royal, A-30 EAST, A-55 NORTH
quebec511 · QC · updated September 23, 2026
- Autoroute 55Lane closure
Access closed, In Trois-Rivières, access from Boulevard Arthur-Rousseau, towards A-55 South
Until Wed, Oct 14, 6:00 a.m. EDT
Maintenance · In Trois-Rivières, access from Boulevard Arthur-Rousseau, towards A-55 SOUTH · In both directions · Access closed · Monday and Tuesday between 7:30 p.m. and 6:30 a.m. the next day · Detour: A-55 NORTH, exit 183, Boulevard Jean-XXIII, A-55 SOUTH
quebec511 · QC · updated September 23, 2026
- Autoroute 55Lane closure
Exit closed, A-55
Until Fri, Oct 16, 6:00 a.m. EDT
Maintenance · In Trois-Rivières, exit 181 (R-138, Boulevard Gene-H.-Kruger) · NORTHBOUND · Exit closed · Wednesday and Thursday between 7:30 p.m. and 6:00 a.m. the next day · Detour: exit 183, Boulevard Jean-XXIII, A-55 SOUTH
quebec511 · QC · updated September 23, 2026
- Autoroute 30Lane closure
Access closed, A-30
Until Fri, Oct 16, 6:00 a.m. EDT
Maintenance · In Bécancour, towards A-55 NORTH · NORTHBOUND · Access closed · Wednesday and Thursday between 7:30 p.m. and 6:00 a.m. the next day · Detour: A-55 SOUTH, A-30 EAST, A-55 NORTH
quebec511 · QC · updated September 23, 2026
- Route 202Lane closure
Alternating traffic, R-202
Until Sun, Oct 18, 8:00 p.m. EDT
Asphalt · In Bedford, Main Street, Bridge Street, between Maziarli Street and Route 235 (Philipsburg Street) · In both directions · Alternating traffic · Monday to Friday between 6 a.m. and 8 p.m.
quebec511 · QC · updated September 22, 2026
- Route 235Lane closure
Alternating traffic, R-235
Until Sun, Oct 18, 8:00 p.m. EDT
Asphalt · In Bedford, on Pont Street, Cyr Street, between Plaisance Street and Campbell Street · In both directions · Alternating traffic · Monday to Friday between 6 a.m. and 8 p.m.
quebec511 · QC · updated September 22, 2026
- Route 202Lane closure
Alternating traffic, R-202
Until Sun, Oct 18, 8:00 p.m. EDT
Asphalt · In Bedford, on Rivière Street, between R-235 (Philipsburg Street) and des Érables Street · In both directions · Alternating traffic · Monday to Friday between 6 a.m. and 8 p.m.
quebec511 · QC · updated September 22, 2026
- Autoroute 20Lane closure
Closure of 1 out of 3 lanes at all times, A-20
Until Mon, Nov 9, 5:00 a.m. EST
Road redevelopment · In Lévis, EAST R-275 · EASTBOUND · Closure of 1 out of 3 lanes at all times
quebec511 · QC · updated September 18, 2026
- Autoroute 20Lane closure
Height restriction under R-175: 4.4 meters, A-20
Until Tue, Nov 10, 11:59 p.m. EST
Bridge repair · In Lévis (Charny), at R-175 · In both directions · Height restriction under R-175: 4.4 meters
quebec511 · QC · updated September 18, 2026
- Autoroute 55Lane closurenorthbound
Roadway closed Northbound, contraflow traffic on the opposite roadway ( 1 lane of 4,75 meters in each…
Until Sat, Oct 17, 11:59 p.m. EDT
Structural repair · In Shawinigan, between exit 223 (Avenue Grand-Mère, 25e Rue) and pont des Piles · At all times: · Roadway closed NORTHBOUND, contraflow traffic on the opposite roadway ( 1 lane of 4,75 meters in each direction) · NORTHBOUND · Lane width reduced to 4.75 meters · Closure of exit 226 (Chemin du Parc-National, 8e Rue) · Detour: R-155 NORTH, Défricheurs roundabout, R-155 SOUTH
quebec511 · QC · updated September 17, 2026
- Route 132Lane closure
Alternating traffic, R-132
Until Thu, Oct 22, 11:59 p.m. EDT
Culvert construction · In Bonaventure, at ruisseau à Day · In both directions · Alternating traffic · Continuously from Monday at midnight to Thursday at 11:59 pm
quebec511 · QC · updated September 17, 2026
- Route 172Lane closure
Alternating traffic at all times, R-172
Until Fri, Oct 16, 6:00 p.m. EDT
Culvert repair · In Saguenay (Chicoutimi), WEST of Chemin Nil-Jean · In both directions · Alternating traffic at all times · Lane width reduced to 5 meters
quebec511 · QC · updated September 16, 2026
- Route 132Lane closure
Traffic on narrowed and diverted lanes at all times, R-132
Until Fri, Oct 30, 11:59 p.m. EDT
Construction of a sidewalk · In Lévis, between Rue de l'Orée and Rue des Pionniers · In both directions · Traffic on narrowed and diverted lanes at all times · Lane width reduced to 3.3 meters
quebec511 · QC · updated September 16, 2026
- Route 385Lane closure
Alternating traffic at all times, R-385
Until Wed, Oct 21, 11:59 p.m. EDT
Road resurfacing · Between km 2 in Forestville and km 26 in the Lac-au-Brochet sector · In both directions · Alternating traffic at all times · Lane width reduced to 5 meters
quebec511 · QC · updated September 16, 2026
- Route 108Lane closure
Alternating traffic at all times, R-108
Until Fri, Nov 13, 11:59 p.m. EST
Maintenance · In Saint-Victor, between Rue des Pins and Rang Sainte-Catherine · In both directions · Alternating traffic at all times · Lane width reduced to 4 meters
quebec511 · QC · updated September 15, 2026
- Route 132Lane closure
Alternating traffic at all times, R-132
Until Thu, Oct 22, 6:00 p.m. EDT
Retaining wall repair · In La Martre, WEST of avenue du Phare · In both directions · Alternating traffic at all times · Lane width reduced to 4 metres
quebec511 · QC · updated September 11, 2026
- Route 218Lane closure
Alternating traffic, R-218
Until Sun, Nov 15, 5:30 p.m. EST
Traffic management element · In Saint-Gilles, at R-269 (rue Ross) · In both directions · Alternating traffic · Continuously from Monday at 7 am to Friday at 5:30 pm
quebec511 · QC · updated September 9, 2026
- Route 269Lane closure
Alternating traffic, R-269
Until Sun, Nov 15, 5:30 p.m. EST
Traffic management element · In Saint-Gilles, at rue Demers · In both directions · Alternating traffic · Continuously from Monday at 7 am to Friday at 5:30 pm
quebec511 · QC · updated September 9, 2026
- Route 289Lane closure
Alternating traffic on a detour route at all times, R-289
Until Fri, Nov 13, 11:59 p.m. EST
Bridge reconstruction · In Rivière-Bleue, between Rang Saint-Hilaire and R-232 · In both directions · Alternating traffic on a detour route at all times
quebec511 · QC · updated September 8, 2026
- Route 265Lane closure
Vehicles, R-265
Until Mon, Dec 21, 6:00 p.m. EST
Bridge reconstruction · At Notre-Dame-de-Lourdes, at the bridge located over the Bécancour river. · In one direction at a time · Vehicles · Alternating traffic, at all times. · Pedestrians and cyclists. · Bridge closed, shuttle service running from 7am to 10pm. · Track width reduced to 3.6 meters. · Overloaded vehicles prohibited. · Left turn towards Rang Saint-Louis Est prohibited.
quebec511 · QC · updated September 8, 2026
- Route 138Lane closure
Alternating traffic at all times, R-138
Until Tue, Dec 1, 11:59 p.m. EST
Bridge repair · In Port-Cartier, EAST of rue du Viaduc · In both directions · Alternating traffic at all times
quebec511 · QC · updated September 4, 2026
- Autoroute 85Lane closure
Lane width reduced to 5 meters, A-85
Until Tue, Dec 1, 11:59 p.m. EST
Highway construction · In Saint-Louis-du-Ha! Ha!, NORTH of rue Raymond, between km 48 and 50 · Contraflow traffic on the SOUTHBOUND roadway (1 lane per direction) at all times · Lane width reduced to 5 meters
quebec511 · QC · updated September 3, 2026
- Autoroute 73Lane closure
Fermeture de 1 voie sur 2, A-73
Since Wed, Sep 2, 10:02 a.m. EDT
A-73 à la hauteur route du Golf · Direction: SUD · Cause: Mesures préventives · Durée: Indéterminée
quebec511 · QC · updated September 2, 2026
- Autoroute 19Lane closure
Fermeture de 1 voie sur 3 en tout temps, A-19
Until Sun, Nov 15, 5:00 a.m. EST
Bridge repairs · Between Montreal and Laval, on the Papineau-Leblanc bridge · Closure of 1 out of 3 lanes at all times
quebec511 · QC · updated September 1, 2026
- Autoroute 440Lane closure
Closure of 1 lane out of 2 at all times, A-440
Until Thu, Dec 31, 11:59 p.m. EST
Bridge replacement · In Québec, Exit 325 (R-368, R-138) · EASTBOUND · Closure of 1 lane out of 2 at all times
quebec511 · QC · updated August 28, 2026
- Autoroute 440Lane closure
Closure of 1 lane out of 3 at all times, A-440
Until Thu, Dec 31, 11:59 p.m. EST
Bridge replacement · In Québec, between A-440 Dufferin-Montmorency, and pont de l'Île-d'Orléans · EASTBOUND · Closure of 1 lane out of 3 at all times
quebec511 · QC · updated August 28, 2026
- Route 132Lane closure
Alternating traffic at all times, R-132
Until Wed, Oct 21, 11:59 p.m. EDT
Retaining wall repair · In La Martre, on both sides of route du Portage · In both directions · Alternating traffic at all times · Lane width reduced to 4 meters
quebec511 · QC · updated August 27, 2026
- Route 138Lane closure
Alternating traffic at all times, R-138
Until Fri, Nov 6, 11:59 p.m. EST
Bridge repair · In Les Escoumins, on the rivière des Petits Escoumins bridge · In both directions · Alternating traffic at all times · Lane width reduced to 5 meters
quebec511 · QC · updated August 26, 2026
- Route 169Lane closure
Traffic on a diverted road at all times, R-169
Until Aug 27, 2027, 11:59 p.m. EDT
Construction of a bridge · In Alma, at Boulevard des Cascades · In both directions · Traffic on a diverted road at all times · Lane width reduced to 3.5 meters
quebec511 · QC · updated August 24, 2026
- Route 138Lane closure
Alternating traffic at all times, R-138
Until Thu, Oct 15, 11:59 p.m. EDT
Bridge repair · Between Rivière-au-Tonnerre and Rivière-Saint-Jean, on the rivière Jupitagon bridge · In both directions · Alternating traffic at all times · Lane width reduced to 4.4 metres
quebec511 · QC · updated August 19, 2026
- Autoroute 5Lane closurenorthbound
Between 6 a.m
Until Mon, Nov 30, 5:00 a.m. EST
Steel structure and pavement repairs · Between Gatineau and Ottawa, on the Macdonald-Cartier Bridge · In both directions · At any time from Monday to Friday: · Between 6 a.m. and 9:30 a.m., 1 of 3 lanes will be closed in the NORTHbound direction. · Between 2:30 p.m. and 9 p.m., one of three lanes will be closed southbound. · ---- · Outside of these hours and continuously throughout the weekend, 2 lanes are available in each direction.
quebec511 · QC · updated August 10, 2026
- Route 113Lane closure
Alternating traffic at all times, R-113
Until Nov 30, 2027, 11:59 p.m. EST
Pavement repair · In Waswanipi, on both sides of Rue Poplar · In both directions · Alternating traffic at all times · Lane width reduced to 3 meters
quebec511 · QC · updated August 7, 2026
- Route 138Lane closure
Closure of 1 lane out of 2, R-138
Until Mon, Nov 23, 11:59 p.m. EST
Traffic management elements · In Baie-Comeau, between rue de Bretagne and R-389 · In both directions · Closure of 1 lane out of 2 · Lane width reduced to 3.5 meters
quebec511 · QC · updated July 31, 2026
- Autoroute 10Lane closure
Closure of 1 out of 2 lanes, at all times, A-10
Until Tue, Oct 20, 5:00 a.m. EDT
Structural repair · In Montreal, in the access road from the Samuel-De Champlain Bridge and on the Clément Bridge · WESTBOUND · Closure of 1 out of 2 lanes, at all times · Track width: 4.5 m
quebec511 · QC · updated July 29, 2026
- Autoroute 73Lane closure
Closure of 1 lane out of 3 at all times, A-73
Until Mon, Nov 30, 11:59 p.m. EST
Construction of a bridge · In Quebec, A-73 Henri-IV, between Boulevard Hochelaga and Chemin Sainte-Foy · NORTHBOUND · Closure of 1 lane out of 3 at all times · Lane width reduced to 3.3 meters each · Clearance height: 4.5 meters
quebec511 · QC · updated July 23, 2026
- British Columbia Highway 1Full closureeastbound
Road construction
Since Thu, Jul 9, 3:23 p.m. PDT
Road construction. Starting Fri Jul 10 until Sat Oct 31. Closed. Traffic will be shifted to the north of the median around 256th St and and will cross over around Lefeuvre Rd. Existing eastbound lanes will be closed. This will remain in place 24/7.
DriveBC · BC · updated July 17, 2026
- Route 389Lane closure
Alternating traffic at all times, R-389
Until Sat, Nov 7, 11:59 p.m. EST
Road redevelopment · Rivière-Mouchalagane Sector, at Km 497 · In both directions · Alternating traffic at all times · Lane width reduced to 5 meters
quebec511 · QC · updated July 10, 2026
- Route 382Lane closure
Alternating traffic, R-382
Until Mon, Nov 16, 11:59 p.m. EST
Structural replacement · At Belleterre, R-382, near the Lac Gauvin outlet, approximately 5 km west of the Belleterre urban area, · In both directions · Alternating traffic · Lane reduced to 5 meters.
quebec511 · QC · updated June 29, 2026
- Route 185Lane closure
Traffic on diverted road at all times., R-185
Until Sun, Nov 1, 11:59 p.m. EST
Highway construction · In Saint-Louis-du-Ha! Ha!, between km 50 and 55 · In both directions · Traffic on diverted road at all times. · Lane width reduced to 4.5 meters
quebec511 · QC · updated June 17, 2026
- Highway 594Full closurewestbound
Construction between Casimer Ave and Earl Ave, Dryden
Since Sun, May 31, 11:00 p.m. CDT
Daily Construction on HWY 594 Westbound between CASIMER AVE and EARL AVE, Dryden. ALL LANES CLOSED.
511 Ontario · ON · updated May 26, 2026
- Route 212Lane closure
Alternating traffic on reduced lanes, at all times, R-212
Until Wed, Oct 28, 6:00 p.m. EDT
Construction of a culvert · At Saint-Augustin-de-Woburn, Notre-Dame ascent, on the Clinton River culvert · In both directions · Alternating traffic on reduced lanes, at all times · Lanes width reduced to 5 meters
quebec511 · QC · updated May 15, 2026
- Route 212Lane closure
Road closed at all times, R-212
Until Wed, Oct 28, 6:00 p.m. EDT
Construction of a culvert · In Saint-Augustin-de-Woburn, on the 3rd and 4th Range Road, between Route 212 and the Lac-Ouest Road · In both directions · Road closed at all times
quebec511 · QC · updated May 15, 2026
- Route 389Lane closure
Alternating traffic at all times, R-389
Until Sat, Nov 7, 11:59 p.m. EST
Route reshaping · Rivière-Mouchalagane sector, at km 478 · In both directions · Alternating traffic at all times
quebec511 · QC · updated May 14, 2026
- Autoroute 20Lane closurewestbound
Access closed at all times, In Rivière-Ouelle, access from Chemin du Haut-de-la-Rivière to A-20 Westbound
Until Mon, Nov 16, 11:59 p.m. EST
Bridge repair · In Rivière-Ouelle, access from Chemin du Haut-de-la-Rivière to A-20 WESTBOUND · In both directions · Access closed at all times · Detour: R-132
quebec511 · QC · updated May 4, 2026
- Autoroute 136Lane closure
Closure of 2 out of 4 lanes, at all times, A-136
Until Thu, Dec 31, 5:00 a.m. EST
Repair of the overpass on Saint-Urbain Street · In Montreal, in the Ville-Marie tunnel, between Robert-Bourassa and Saint-Laurent Boulevards · EASTBOUND · Closure of 2 out of 4 lanes, at all times
quebec511 · QC · updated April 23, 2026
- Route 204Lane closure
Fermeture de 1 voie sur 2, R-204
Since Mon, Apr 13, 7:27 a.m. EDT
R-204 à la hauteur chemin du Lac-Drolet · Direction: OUEST et EST · Cause: Bris de la route · Durée: Indéterminée
quebec511 · QC · updated April 13, 2026
- Route 265Lane closure
Overloaded heavy vehicles prohibited., In Notre-Dame-de-Lourdes, on the Saint-Louis East and West roads, at…
Until Mon, Dec 21, 6:00 p.m. EST
Bridge reconstruction · In Notre-Dame-de-Lourdes, on the Saint-Louis East and West roads, at the intersection of route 265. · Alternating traffic, at all times. · Overloaded heavy vehicles prohibited. · Right turn onto Route 265 prohibited.
quebec511 · QC · updated April 8, 2026
- Route 132Lane closure
Alternating traffic, from Monday to Thursday between 6 am and 6:30 pm, R-132
Until Thu, Dec 31, 6:00 p.m. EST
Public services · Between route de la Passerelle in Port-Daniel-Gascons and route Allain in Chandler · In both directions · Alternating traffic, from Monday to Thursday between 6 am and 6:30 pm · Lane width reduced to 3.5 meters
quebec511 · QC · updated February 5, 2026
- Autoroute 15Lane closure
Reduction of the number of lanes from 8 to 3 towards Canada, A-15
Until Dec 1, 2027, 11:59 p.m. EST
Redevelopment of the primary inspection line at the border post · In Saint-Bernard-de-Lacolle · At the Saint-Bernard-de-Lacolle border crossing · Northbound · Reduction of the number of lanes from 8 to 3 towards Canada
quebec511 · QC · updated December 2, 2025
- Autoroute 15Lane closure
No lane closures, A-15
Until Dec 31, 2029, 11:58 p.m. EST
Restrictions at the Saint-Bernard-de-Lacolle border crossing in the northbound direction · In Saint-Bernard-de-Lacolle · The entry point of Saint-Bernard-de-Lacolle · Northbound · No lane closures · Restrictions for non-standard vehicles in size having: · more than 5 m high · more than 2.6 m wide · more than 23 m long · Detour via the Lacolle port of entry via R-221, (on the other side of the US port of entry Overton Corners, NY). · NOTE: This notice does not apply to road trains with trailers 16.2 m long or less.
quebec511 · QC · updated October 17, 2025
- Alberta Highway 857Lane closure
Highway 857 north of Township Road 542, 19 km north of Vegreville - bridge construction work until October 17
Until Sat, Oct 17, 7:00 p.m. MDT
Highway 857 north of Township Road 542, 19 km north of Vegreville - bridge construction work until October 17. Expect one-lane alternating traffic with temporary traffic signals in place. · Bridge construction on HWY-857 Both Directions Near Township Road 542. Lane Alternating. Width Restriction: 4m Speed Restriction: 30km/hr Activities: One - lane alt traffic, No passing, Speed reduction, Temp traffic signals, Rough road, Fresh oil, No centerline marking, Narrow lane, Narrow shoulder, No wide loads, Flag persons, Be prepared to stop, On site detour, Bridge closed, Uneven pavement Visibility:
511 Alberta · AB · updated 12 hr ago
- Alberta Highway 8Lane closure
Highway 8 at the Elbow River Bridge, west of Calgary - bridge replacement and road reconfiguration work until October 30, 2026
Until Fri, Oct 30, 5:30 p.m. MDT
Highway 8 at the Elbow River Bridge, west of Calgary - bridge replacement and road reconfiguration work until October 30, 2026. Expect lane closures with speed reduced to 60 km/h. Lane width reduced to 3.7 meters. Temporary signals and flag persons on site. Drive with caution and expect major delays. · Bridge construction on HWY-8 Both Directions Near Elbow River. Width Restriction: 3.7m Activities: Lane closure, No passing, Speed reduction, Temp traffic signals, No centerline marking, Grooved pavement, Narrow lane, Narrow shoulder, Pavement drop-off, Be prepared to stop, Traffic congestion, O
511 Alberta · AB · updated 12 hr ago
- 480 less urgent entries not shown. All of them are on the live map.
Planned 397
- Highway 416Lane closurenorthbound
Construction between L & G Rd 43 (IC 34) (Kemptville), Kemptville and Century Rd / Prince of Wales Dr (Cr 73), Ottawa
Starts Mon, Oct 12, 12:00 a.m. EDT
Daily Construction on HWY 416 Northbound between L & G RD 43 (IC 34) (KEMPTVILLE), Kemptville and CENTURY RD / PRINCE OF WALES DR (CR 73), Ottawa. 1 Alternating Lane(s).
511 Ontario · ON · updated 1 day ago
- Highway 416Lane closurenorthbound
Construction between 3RD Line Rd and Roger Stevens Dr (IC 49)/Cr 6, Ottawa
Starts Mon, Oct 12, 12:00 a.m. EDT
Daily Construction on HWY 416 Northbound between 3RD LINE RD and ROGER STEVENS DR (IC 49)/CR 6, Ottawa. 1 Alternating Lane(s).
511 Ontario · ON · updated 1 day ago
- Highway 23Lane closurenorthbound
Construction at Perth Line 20 / County Road 20, Russeldale
Starts Mon, Oct 12, 7:00 a.m. EDT
Daily Construction on HWY 23 Northbound between Perth Line 20 / County Road 20 and Perth Line 20 / County Road 20, Russeldale. 1 Right Lane(s).
511 Ontario · ON · updated September 18, 2026
- Highway 417Lane closureeastbound
Construction between Greenfield Rd-Cr 30 (Dunvegan)/Cr 22, St-Isidore and Hwy 34 (IC 27), Vankleek Hill
Starts Mon, Oct 12, 7:00 a.m. EDT
Daily Construction on HWY 417 Eastbound between GREENFIELD RD-CR 30 (DUNVEGAN)/CR 22, St-Isidore and HWY 34 (IC 27), Vankleek Hill. 1 Left Lane(s).
511 Ontario · ON · updated 1 day ago
- Highway 11Lane closurenorthbound
Engineering Investigation between Sec Hwy 613 - Devlin and Barwick Rd ( N) - Riverview Park Rd (S), Emo
Starts Mon, Oct 12, 7:00 a.m. CDT
Daily Engineering Investigation on HWY 11 Northbound between SEC HWY 613 - DEVLIN and BARWICK RD ( N) - RIVERVIEW PARK RD (S), Emo. 1 Alternating Lane(s).
511 Ontario · ON · updated 4 days ago
- Alberta Highway 893Lane closure
Highway 892 bridge over the Heinsburg River, south of Frog Lake - bridge inspection between October 12 to October 14 from 7:00am…
Starts Mon, Oct 12, 7:00 a.m. MDT
Highway 892 bridge over the Heinsburg River, south of Frog Lake - bridge inspection between October 12 to October 14 from 7:00am to 7:00pm. Expect one-lane alternating traffic controlled by temporary traffic signals, with a speed reduction to 50 km/h. · Bridge Inspection on HWY-893 All Directions Near North Saskatchewan River. Lane Alternating. Speed Restriction: 50km/hr Activities: One - lane alt traffic, Speed reduction, Temp traffic signals, Traffic congestion, Expect traffic delays, Drive with caution
511 Alberta · AB · updated 12 hr ago
- Alberta Highway 2Lane closure
Highway 2 at the junction of Highway 743, Peace River - traffic signal maintenance, October 12 to October 20 during day and night
Starts Mon, Oct 12, 8:00 a.m. MDT
Highway 2 at the junction of Highway 743, Peace River - traffic signal maintenance, October 12 to October 20 during day and night. Expect closure of the acceleration/deceleration lanes, speed reduction, and flaggers as necessary. · Traffic Signal Maintenance on HWY-2 All Directions At HWY-743. Speed Restriction: 46km/hr Activities: Lane closure, Speed reduction, Flag persons, Traffic congestion, Drive with caution, Highway Maintenance Vehicles
511 Alberta · AB · updated 12 hr ago
- Alberta Highway 2Lane closure
Highway 2 at 78 Street, Peace River - traffic signal maintenance, October 12 to October 20, day and night
Starts Mon, Oct 12, 8:00 a.m. MDT
Highway 2 at 78 Street, Peace River - traffic signal maintenance, October 12 to October 20, day and night. Expect closure of the acceleration/deceleration lanes, speed reduction, and flaggers as necessary. · Traffic Signal Maintenance on HWY-2 All Directions At 78 St. Speed Restriction: 50km/hr Activities: Lane closure, Speed reduction, Flag persons, Traffic congestion, Drive with caution, Highway Maintenance Vehicles
511 Alberta · AB · updated 12 hr ago
- Alberta Highway 36Construction
Highway 36 at Township Road 102, near Taber - powerline work, October 12, 2026, to January 11, 2027
Starts Mon, Oct 12, 8:00 a.m. MDT
Highway 36 at Township Road 102, near Taber - powerline work, October 12, 2026, to January 11, 2027. The majority of the work will occur adjacent to the roadway. Watch for workers in the area. Traffic control will be on site as required. Over dimensional loads are permitted to pass through the work zone. · Power Work on HWY-36 Both Directions Near Township Road 102. Activities: Traffic congestion, Expect traffic delays, Drive with caution, Follow Directions
511 Alberta · AB · updated 12 hr ago
- Highway 401Lane closurewestbound
Construction between North Talbot Rd and Pulford Tunnel, Windsor
Starts Mon, Oct 12, overnight
Nightly Construction on HWY 401 Westbound between North Talbot Rd and Pulford Tunnel, Windsor. 2 Right Lane(s).
511 Ontario · ON · updated 2 days ago
- Highway 417Lane closurewestbound
Construction between Vanier Pkwy/Riverside (IC 117) and Metcalfe St (IC 119A), Ottawa
Starts Mon, Oct 12, overnight
Nightly Construction on HWY 417 Westbound between VANIER PKWY/RIVERSIDE (IC 117) and METCALFE ST (IC 119A), Ottawa. 2 Right Lane(s).
511 Ontario · ON · updated 4 days ago
- Highway 417Lane closurewestbound
Construction between Lees Ave and Metcalfe St (IC 119A), Ottawa
Starts Mon, Oct 12, overnight
Nightly Construction on HWY 417 Westbound between LEES AVE and METCALFE ST (IC 119A), Ottawa. 2 Left Lane(s).
511 Ontario · ON · updated 4 days ago
- Highway 417Lane closureeastbound
Construction between Metcalfe St (IC 119A) and Lees Ave, Ottawa
Starts Mon, Oct 12, overnight
Nightly Construction on HWY 417 Eastbound between METCALFE ST (IC 119A) and LEES AVE, Ottawa. 2 Right Lane(s).
511 Ontario · ON · updated 4 days ago
- Highway 417Lane closureeastbound
Construction between Metcalfe St (IC 119A) and Lees Ave, Ottawa
Starts Mon, Oct 12, overnight
Nightly Construction on HWY 417 Eastbound between METCALFE ST (IC 119A) and LEES AVE, Ottawa. 2 Left Lane(s).
511 Ontario · ON · updated 4 days ago
- Alberta Highway 216Lane closurewestbound
Westbound Anthony Henday Drive NW near North Saskatchewan River, Edmonton - overhead sign maintenance, October 12 between 9pm and…
Starts Mon, Oct 12, 9:00 p.m. MDT
Westbound Anthony Henday Drive NW near North Saskatchewan River, Edmonton - overhead sign maintenance, October 12 between 9pm and 5am. Expect lane closure, speed reduction, follow directions and drive with caution. · Overhead sign maintenance on HWY-216 Westbound Near North Saskatchewan River. Speed Restriction: 80km/hr Activities: Lane closure, Speed reduction, Expect traffic delays, Drive with caution, Follow Directions
511 Alberta · AB · updated 12 hr ago
- Alberta Highway 216Lane closuresouthbound
Southbound Anthony Henday Drive NW near Callingwood Road, Edmonton - overhead sign maintenance, October 12 between 9pm and 5am…
Starts Mon, Oct 12, 9:00 p.m. MDT
Southbound Anthony Henday Drive NW near Callingwood Road, Edmonton - overhead sign maintenance, October 12 between 9pm and 5am, Expect lane closure, speed reduction, follow directions and drive with caution. · Overhead sign maintenance on HWY-216 Southbound Near Callingwood Road. Speed Restriction: 80km/hr Activities: Lane closure, Speed reduction, Expect traffic delays, Drive with caution, Follow Directions
511 Alberta · AB · updated 12 hr ago
- Highway 417Lane closureeastbound
Engineering Investigation between Aviation Pkwy (IC 113A) and Innes Rd (IC 112), Ottawa
Starts Mon, Oct 12, overnight
Nightly Engineering Investigation on HWY 417 Eastbound between AVIATION PKWY (IC 113A) and INNES RD (IC 112), Ottawa. 1 Right Lane(s).
511 Ontario · ON · updated 5 days ago
- Highway 401Lane closureeastbound
Construction between Stewart Blvd (IC 696)/Leeds & Grenville Cr 29 (Brockville) and North Augusta Rd (IC 698)…
Starts Mon, Oct 12, overnight
Nightly Construction on HWY 401 Eastbound between STEWART BLVD (IC 696)/Leeds & Grenville CR 29 (Brockville) and North AUGUSTA RD (IC 698), Brockville. 1 Alternating Lane(s).
511 Ontario · ON · updated 3 days ago
- Highway 401Lane closureeastbound
Construction, collector between Leslie Street and Don Mills Road, Toronto
Starts Mon, Oct 12, overnight
Nightly Construction on HWY 401 Eastbound Collector between LESLIE STREET and DON MILLS ROAD, Toronto. 2 Alternating Lane(s).
511 Ontario · ON · updated 4 days ago
- Highway 400Lane closurenorthbound
Construction between Hwy 12 N Jct and Port Severn Road, Tay
Starts Tue, Oct 13, 12:00 a.m. EDT
Daily Construction on HWY 400 Northbound between HWY 12 N JCT and PORT SEVERN ROAD, Tay. 1 Alternating Lane(s).
511 Ontario · ON · updated September 21, 2026
- Highway 400Lane closuresouthbound
Maintenance between Teston Road and Major Mackenzie Drive, Vaughan
Starts Tue, Oct 13, overnight
Nightly Maintenance on HWY 400 Southbound between TESTON ROAD and MAJOR MACKENZIE DRIVE, Vaughan. 1 Alternating Lane(s).
511 Ontario · ON · updated 5 days ago
- Highway 400Lane closurenorthbound
Construction between Hwy 88 and 13TH Concession, Bradford
Starts Tue, Oct 13, 12:00 a.m. EDT
Daily Construction on HWY 400 Northbound between HWY 88 and 13TH CONCESSION, Bradford. 1 Alternating Lane(s).
511 Ontario · ON · updated 4 days ago
- Highway 401Lane closureeastbound
Construction between Townline Road / Wellington Rd 33 (286KM), Cambridge and Highway 6 South / Brock Road / Wellington…
Starts Tue, Oct 13, 12:00 a.m. EDT
Daily Construction on HWY 401 Eastbound between Townline Road / Wellington Rd 33 (286KM), Cambridge and Highway 6 South / Brock Road / Wellington Rd 46 (299KM), Morriston. 1 Alternating Lane(s).
511 Ontario · ON · updated 1 day ago
- Highway 6Ramp closuresouthbound
Construction, on-ramp at York Road, Hamilton
Starts Tue, Oct 13, 12:30 a.m. EDT
Continuous Construction on HWY 6 Southbound On-ramp at YORK ROAD, Hamilton. ALL LANES CLOSED.
511 Ontario · ON · updated October 1, 2026
- Highway 6Ramp closuresouthbound
Construction, off-ramp at York Road, Hamilton
Starts Tue, Oct 13, 12:30 a.m. EDT
Continuous Construction on HWY 6 Southbound Off-ramp at YORK ROAD, Hamilton. ALL LANES CLOSED.
511 Ontario · ON · updated October 1, 2026
- Highway 407Lane closureeastbound
Maintenance between Kinsale Rd, Ajax and Lake Ridge Rd, Whitby
Starts Tue, Oct 13, 12:30 a.m. EDT
Continuous Maintenance on HWY 407 ETR Eastbound between KINSALE RD, Ajax and LAKE RIDGE RD, Whitby. 1 Left Lane(s).
511 Ontario · ON · updated 3 days ago
- QEWRamp closureFort Erie-bound
Construction, on-ramp at Netherby Road, Fort Erie
Starts Tue, Oct 13, 6:00 a.m. EDT
Daily Construction on QEW Fort Erie Bound On-ramp at NETHERBY ROAD, Fort Erie. ALL LANES CLOSED.
511 Ontario · ON · updated 4 days ago
- QEWRamp closureFort Erie-bound
Construction, off-ramp at Netherby Road, Fort Erie
Starts Tue, Oct 13, 6:00 a.m. EDT
Daily Construction on QEW Fort Erie Bound Off-ramp at NETHERBY ROAD, Fort Erie. ALL LANES CLOSED.
511 Ontario · ON · updated 4 days ago
- QEWRamp closureFort Erie-bound
Construction, off-ramp at Lyons Creek Road, Niagara Falls
Starts Tue, Oct 13, 6:00 a.m. EDT
Daily Construction on QEW Fort Erie Bound Off-ramp at LYONS CREEK ROAD, Niagara Falls. ALL LANES CLOSED.
511 Ontario · ON · updated 4 days ago
- QEWRamp closureToronto-bound
Construction, on-ramp at Lyons Creek Road, Niagara Falls
Starts Tue, Oct 13, 6:00 a.m. EDT
Daily Construction on QEW Toronto bound On-ramp at LYONS CREEK ROAD, Niagara Falls. ALL LANES CLOSED.
511 Ontario · ON · updated 4 days ago
- QEWRamp closureToronto-bound
Construction, off-ramp at Lyons Creek Road, Niagara Falls
Starts Tue, Oct 13, 6:00 a.m. EDT
Daily Construction on QEW Toronto bound Off-ramp at LYONS CREEK ROAD, Niagara Falls. ALL LANES CLOSED.
511 Ontario · ON · updated 4 days ago
- QEWRamp closureToronto-bound
Construction, off-ramp at Netherby Road, Fort Erie
Starts Tue, Oct 13, 6:00 a.m. EDT
Continuous Construction on QEW Toronto bound Off-ramp at NETHERBY ROAD, Fort Erie. ALL LANES CLOSED.
511 Ontario · ON · updated 4 days ago
- QEWRamp closureToronto-bound
Construction, on-ramp at Netherby Road, Fort Erie
Starts Tue, Oct 13, 6:00 a.m. EDT
Daily Construction on QEW Toronto bound On-ramp at NETHERBY ROAD, Fort Erie. ALL LANES CLOSED.
511 Ontario · ON · updated 4 days ago
- QEWRamp closureToronto-bound
Construction, on-ramp at Lyons Creek Road, Niagara Falls
Starts Tue, Oct 13, 6:00 a.m. EDT
Daily Construction on QEW Toronto bound On-ramp at LYONS CREEK ROAD, Niagara Falls. ALL LANES CLOSED.
511 Ontario · ON · updated 4 days ago
- QEWRamp closureFort Erie-bound
Construction, on-ramp at Lyons Creek Road, Niagara Falls
Starts Tue, Oct 13, 6:00 a.m. EDT
Daily Construction on QEW Fort Erie Bound On-ramp at LYONS CREEK ROAD, Niagara Falls. ALL LANES CLOSED.
511 Ontario · ON · updated 4 days ago
- Highway 7ALane closurewestbound
Construction between Nesbitt Line Road and Regional Road 57 South, Port Perry
Starts Tue, Oct 13, 6:00 a.m. EDT
Daily Construction on HWY 7A Westbound between NESBITT LINE ROAD and REGIONAL ROAD 57 SOUTH, Port Perry. 1 Alternating Lane(s).
511 Ontario · ON · updated 4 days ago
- Highway 401Lane closurewestbound
Construction at Sd&g Rd 31 (IC 750) - Morrisburg, Morrisburg
Starts Tue, Oct 13, 7:00 a.m. EDT
Daily Construction on HWY 401 Westbound between SD&G RD 31 (IC 750) - Morrisburg and SD&G RD 31 (IC 750) - Morrisburg, Morrisburg. 1 Right Lane(s).
511 Ontario · ON · updated 4 days ago
- Highway 401Lane closureeastbound
Construction at Sd&g Rd 31 (IC 750) - Morrisburg, Morrisburg
Starts Tue, Oct 13, 7:00 a.m. EDT
Daily Construction on HWY 401 Eastbound between SD&G RD 31 (IC 750) - Morrisburg and SD&G RD 31 (IC 750) - Morrisburg, Morrisburg. 1 Right Lane(s).
511 Ontario · ON · updated 4 days ago
- Highway 17Lane closureeastbound
Engineering Investigation at Macintyre Rd North Ent (Hwy 7045)Heyden, Heyden
Starts Tue, Oct 13, 7:00 a.m. EDT
Continuous Engineering Investigation on HWY 17 Eastbound between MACINTYRE RD NORTH ENT (HWY 7045)HEYDEN and MACINTYRE RD NORTH ENT (HWY 7045)HEYDEN, Heyden. 1 Alternating Lane(s).
511 Ontario · ON · updated 4 days ago
- Highway 539Lane closurenorthbound
Engineering Investigation between Sec Hwy 539A-River Valley, and Gravel Rd(S)Gibbons Twp, River Valley
Starts Tue, Oct 13, 7:00 a.m. EDT
Continuous Engineering Investigation on HWY 539 Northbound between SEC HWY 539A-RIVER VALLEY, and GRAVEL RD(S)GIBBONS TWP, River Valley. 1 Alternating Lane(s).
511 Ontario · ON · updated 4 days ago
- Highway 533Lane closurenorthbound
Engineering Investigation between Forest Access Rd(E) and Hartshorn Lake, Mattawan, Mattawan
Starts Tue, Oct 13, 7:00 a.m. EDT
Continuous Engineering Investigation on HWY 533 Northbound between FOREST ACCESS RD(E) and Hartshorn Lake, Mattawan, Mattawan. 1 Alternating Lane(s).
511 Ontario · ON · updated 4 days ago
- Highway 6Lane closurenorthbound
Construction at Maple Drive, Miller Lake
Starts Tue, Oct 13, 7:00 a.m. EDT
Daily Construction on HWY 6 Northbound between Maple Drive and Maple Drive, Miller Lake. 1 Alternating Lane(s).
511 Ontario · ON · updated 4 days ago
- Highway 26Lane closurewestbound
Construction at Lora Bay Drive / 11th Line, Thornbury
Starts Tue, Oct 13, 7:00 a.m. EDT
Daily Construction on HWY 26 Westbound between Lora Bay Drive / 11th Line and Lora Bay Drive / 11th Line, Thornbury. 1 Alternating Lane(s).
511 Ontario · ON · updated 4 days ago
- Highway 6Lane closurenorthbound
Construction between Bruce Road 9, Wiarton and Lindsay Road 20
Starts Tue, Oct 13, 7:00 a.m. EDT
Daily Construction on HWY 6 Northbound between Bruce Road 9, Wiarton and Lindsay Road 20, . 1 Alternating Lane(s).
511 Ontario · ON · updated October 2, 2026
- Highway 401Lane closureeastbound
Construction between Manning Road / Essex Rd 19 and Highway 77 / Comber Side Road, Windsor
Starts Tue, Oct 13, 7:00 a.m. EDT
Daily Construction on HWY 401 Eastbound between Manning Road / Essex Rd 19 and Highway 77 / Comber Side Road, Windsor. 1 Alternating Lane(s).
511 Ontario · ON · updated 3 days ago
- Highway 101Lane closureeastbound
Engineering Investigation between Porcupine East Lmts(Old Railway X-Ing) and Bob's Lake Dr, Porcupine, Porcupine
Starts Tue, Oct 13, 7:00 a.m. EDT
Daily Engineering Investigation on HWY 101 Eastbound between PORCUPINE EAST LMTS(OLD RAILWAY X-ING) and BOB'S LAKE DR, PORCUPINE, Porcupine. 1 Alternating Lane(s).
511 Ontario · ON · updated 2 days ago
- Highway 60Lane closureeastbound
Engineering Investigation between Stuart Rd / Dillabough Rd, Douglas and Pinnacle Rd - Renfrew town limits, Renfrew
Starts Tue, Oct 13, 7:30 a.m. EDT
Daily Engineering Investigation on HWY 60 Eastbound between STUART RD / DILLABOUGH RD, Douglas and Pinnacle Rd - Renfrew town limits, Renfrew. 1 Alternating Lane(s).
511 Ontario · ON · updated 2 days ago
- Highway 65Lane closuresouthbound
Engineering Investigation between Cane Rd 4, Kenabeek, Kenabeek and Henwood Rd 4, New Liskeard, New Liskeard
Starts Tue, Oct 13, 8:00 a.m. EDT
Daily Engineering Investigation on HWY 65 Southbound between Cane Rd 4, Kenabeek, Kenabeek and Henwood Rd 4, New Liskeard, New Liskeard. 1 Alternating Lane(s).
511 Ontario · ON · updated 5 days ago
- Highway 11Lane closurenorthbound
Engineering Investigation between Wawbewawa Rd and Concession Rd 3, Englehart, Englehart
Starts Tue, Oct 13, 8:00 a.m. EDT
Daily Engineering Investigation on HWY 11 Northbound between WAWBEWAWA RD and Concession Rd 3, Englehart, Englehart. 1 Alternating Lane(s).
511 Ontario · ON · updated 5 days ago
- Highway 401Lane closurewestbound
Construction between Mill Street / Sweaburg Road / Oxford Rd 12 (230KM), Woodstock and Foldens Line / Oxford Rd 6/Embro…
Starts Tue, Oct 13, 8:00 a.m. EDT
Daily Construction on HWY 401 Westbound between Mill Street / Sweaburg Road / Oxford Rd 12 (230KM), Woodstock and Foldens Line / Oxford Rd 6/Embro Road, Ingersoll. 1 Alternating Lane(s).
511 Ontario · ON · updated 5 days ago
- Highway 17Lane closureeastbound
Engineering Investigation between English River Br and Graham Rd (N) - Glfp Rd(S) - Stedman Twp, Upsala
Starts Tue, Oct 13, 7:00 a.m. CDT
Daily Engineering Investigation on HWY 17 Eastbound between ENGLISH RIVER BR and GRAHAM RD (N) - GLFP RD(S) - STEDMAN TWP, Upsala. 1 Alternating Lane(s).
511 Ontario · ON · updated 2 days ago
- Highway 24Lane closurenorthbound
Construction between Powerline Road [Brantford-North Limits], Brantford and Governors Road , Osborne Corners
Starts Tue, Oct 13, 8:00 a.m. EDT
Daily Construction on HWY 24 Northbound between POWERLINE ROAD [BRANTFORD-NORTH LIMITS], Brantford and Governors Road , Osborne Corners. 1 Alternating Lane(s).
511 Ontario · ON · updated 2 days ago
- Alberta Highway 627Lane closure
Highway 60 and Highway 627 intersection, west of Edmonton - construction work
Starts Tue, Oct 13, 7:00 a.m. MDT
Highway 60 and Highway 627 intersection, west of Edmonton - construction work. October 13 to November 15 during daylight hours. Expect lane closure, one lane alternating traffic, speed reduction, narrow lane and be prepared to stop. · Construction Work on HWY-627 Both Directions from Sprucehill Dr to HWY-60 . Activities: Lane closure, One - lane alt traffic, No passing, Speed reduction, No centerline marking, Narrow lane, Narrow shoulder, Flag persons, Pilot vehicles, Be prepared to stop, One lane travel, Two way traffic
511 Alberta · AB · updated 12 hr ago
- Alberta Highway 60Lane closure
Highway 60 and Highway 627 intersection, west of Edmonton - construction work
Starts Tue, Oct 13, 7:00 a.m. MDT
Highway 60 and Highway 627 intersection, west of Edmonton - construction work. October 13 to November 15 during daylight hours. Expect lane closure, one lane alternating traffic, speed reduction, narrow lane and be prepared to stop. · Construction Work on HWY-60 Both Directions from Township Road 522 to Township Road 515A . Activities: Lane closure, One - lane alt traffic, No passing, Speed reduction, No centerline marking, Narrow lane, Narrow shoulder, Flag persons, Pilot vehicles, Be prepared to stop, One lane travel, Two way traffic
511 Alberta · AB · updated 12 hr ago
- Alberta Highway 2Constructionnorthbound
Northbound QEII to Southbound QEII - construction work including grading and street light installation, October 13 to December…
Starts Tue, Oct 13, 7:00 a.m. MDT
Northbound QEII to Southbound QEII - construction work including grading and street light installation, October 13 to December 23, 24 hrs/day. Expect possible lane closures and delays due to site construction activities. Posted speed lowered to 50 km/h. Watch for workers, equipment and flaggers. · Construction Work on HWY-2 Northbound from HWY-616 to HWY-2A Northbound . Width Restriction: 3.7m Speed Restriction: 50km/hr
511 Alberta · AB · updated 12 hr ago
- Highway 93Lane closurenorthbound
Moving maintenance between Hwy 400, Springwater and Hwy 12/Angela Schmidt Foster Road, Tay
Starts Tue, Oct 13, 9:00 a.m. EDT
Daily Moving Maintenance Closure on HWY 93 Northbound between HWY 400, Springwater and HWY 12/ANGELA SCHMIDT FOSTER ROAD, Tay. 1 Alternating Lane(s).
511 Ontario · ON · updated September 15, 2026
- Highway 89Lane closureeastbound
Moving maintenance between Mono-Adjala Townline Road and Hwy 400, Essa
Starts Tue, Oct 13, 9:00 a.m. EDT
Daily Moving Maintenance Closure on HWY 89 Eastbound between MONO-ADJALA TOWNLINE ROAD and HWY 400, Essa. 1 Alternating Lane(s).
511 Ontario · ON · updated September 15, 2026
- Highway 12Lane closuresouthbound
Moving maintenance between Hwy 93/Simcoe Road 93, Midland and Harvey Settlement Road/Fairgrounds Road, Oro Medonte
Starts Tue, Oct 13, 9:00 a.m. EDT
Daily Moving Maintenance Closure on HWY 12 Southbound between HWY 93/SIMCOE ROAD 93, Midland and HARVEY SETTLEMENT ROAD/FAIRGROUNDS ROAD, Oro Medonte. 1 Alternating Lane(s).
511 Ontario · ON · updated September 15, 2026
- Highway 26Lane closurewestbound
Moving maintenance between Carson Road, Springwater and Poplar Sideroad, Clearview
Starts Tue, Oct 13, 9:00 a.m. EDT
Daily Moving Maintenance Closure on HWY 26 Westbound between CARSON ROAD, Springwater and POPLAR SIDEROAD, Clearview. 1 Alternating Lane(s).
511 Ontario · ON · updated September 15, 2026
- Highway 93Lane closuresouthbound
Moving maintenance between Hwy 12/Angela Schmidt Foster Road, Tay and Hwy 400, Springwater
Starts Tue, Oct 13, 9:00 a.m. EDT
Daily Moving Maintenance Closure on HWY 93 Southbound between HWY 12/ANGELA SCHMIDT FOSTER ROAD, Tay and HWY 400, Springwater. 1 Alternating Lane(s).
511 Ontario · ON · updated September 15, 2026
- Highway 89Lane closurewestbound
Moving maintenance between Hwy 400 and Mono-Adjala Townline Road, Essa
Starts Tue, Oct 13, 9:00 a.m. EDT
Daily Moving Maintenance Closure on HWY 89 Westbound between HWY 400 and MONO-ADJALA TOWNLINE ROAD, Essa. 1 Alternating Lane(s).
511 Ontario · ON · updated September 15, 2026
- Highway 26Lane closureeastbound
Moving maintenance between Poplar Sideroad, Clearview and Carson Road, Springwater
Starts Tue, Oct 13, 9:00 a.m. EDT
Daily Moving Maintenance Closure on HWY 26 Eastbound between POPLAR SIDEROAD, Clearview and CARSON ROAD, Springwater. 1 Alternating Lane(s).
511 Ontario · ON · updated September 15, 2026
- Highway 12Lane closurenorthbound
Moving maintenance between Harvey Settlement Road/Fairgrounds Road, Oro Medonte and Hwy 93/Simcoe Road 93, Midland
Starts Tue, Oct 13, 9:00 a.m. EDT
Daily Moving Maintenance Closure on HWY 12 Northbound between HARVEY SETTLEMENT ROAD/FAIRGROUNDS ROAD, Oro Medonte and HWY 93/SIMCOE ROAD 93, Midland. 1 Alternating Lane(s).
511 Ontario · ON · updated September 15, 2026
- Highway 12Lane closuresouthbound
Moving maintenance between Atherley Rd, Orillia and Durham Rd 50, Ramara
Starts Tue, Oct 13, 9:00 a.m. EDT
Daily Moving Maintenance Closure on HWY 12 Southbound between ATHERLEY RD, Orillia and DURHAM RD 50, Ramara. 1 Alternating Lane(s).
511 Ontario · ON · updated September 15, 2026
- Highway 12Lane closurenorthbound
Moving maintenance between Durham Rd 50, Ramara and Atherley Rd, Orillia
Starts Tue, Oct 13, 9:00 a.m. EDT
Daily Moving Maintenance Closure on HWY 12 Northbound between DURHAM RD 50, Ramara and ATHERLEY RD, Orillia. 1 Alternating Lane(s).
511 Ontario · ON · updated September 15, 2026
- Highway 11Lane closuresouthbound
Moving maintenance between Severn River Bridge/West Branch, Severn and Laclie Street, Orillia
Starts Tue, Oct 13, 9:00 a.m. EDT
Daily Moving Maintenance Closure on HWY 11 Southbound between SEVERN RIVER BRIDGE/WEST BRANCH, Severn and LACLIE STREET, Orillia. 1 Alternating Lane(s).
511 Ontario · ON · updated September 15, 2026
- Highway 11Lane closurenorthbound
Moving maintenance between Laclie Street, Orillia and Severn River Bridge/West Branch, Severn
Starts Tue, Oct 13, 9:00 a.m. EDT
Daily Moving Maintenance Closure on HWY 11 Northbound between LACLIE STREET, Orillia and SEVERN RIVER BRIDGE/WEST BRANCH, Severn. 1 Alternating Lane(s).
511 Ontario · ON · updated September 15, 2026
- Highway 401Lane closurewestbound
Construction between Hwy 35/115 and Liberty St, Clarington
Starts Tue, Oct 13, 9:00 a.m. EDT
Daily Construction on HWY 401 Westbound between HWY 35/115 and LIBERTY ST, Clarington. 1 Alternating Lane(s).
511 Ontario · ON · updated October 2, 2026
- Highway 400Lane closuresouthbound
Construction between 13TH Concession and Hwy 88, Bradford
Starts Tue, Oct 13, 9:00 a.m. EDT
Daily Construction on HWY 400 Southbound between 13TH CONCESSION and HWY 88, Bradford. 1 Alternating Lane(s).
511 Ontario · ON · updated 4 days ago
- Highway 85Lane closurenorthbound
Construction between Hwy 7 IC-Victoria St-Kitchener, Kitchener and Northfield Dr IC-Waterloo Rd 50, Waterloo
Starts Tue, Oct 13, 9:00 a.m. EDT
Daily Construction on HWY 85 Northbound between HWY 7 IC-VICTORIA ST-KITCHENER, Kitchener and NORTHFIELD DR IC-WATERLOO RD 50, Waterloo. 1 Right Lane(s).
511 Ontario · ON · updated 2 days ago
- Highway 10Lane closuresouthbound
Construction between Forks of the Credit Road and Old School Road, Caledon
Starts Tue, Oct 13, overnight
Nightly Construction on HWY 10 Southbound between FORKS OF THE CREDIT ROAD and OLD SCHOOL ROAD, Caledon. 1 Alternating Lane(s).
511 Ontario · ON · updated 2 days ago
- Highway 401Lane closurewestbound
Maintenance between Joyceville Rd (IC 632)/Frontenac Cr 16, Gananoque and Westbrook Rd, Odessa
Starts Tue, Oct 13, 9:00 a.m. EDT
Daily Maintenance on HWY 401 Westbound between JOYCEVILLE RD (IC 632)/Frontenac CR 16, Gananoque and WESTBROOK RD, Odessa. 1 Left Lane(s).
511 Ontario · ON · updated 1 day ago
- Highway 417Lane closureeastbound
Maintenance between White Lake Rd (IC184)/Cr 2 (Antrim Truck Stop) and Ottawa Rd 29 (IC 180), Arnprior
Starts Tue, Oct 13, 9:00 a.m. EDT
Continuous Maintenance on HWY 417 Eastbound between WHITE LAKE RD (IC184)/CR 2 (Antrim Truck Stop) and OTTAWA RD 29 (IC 180), Arnprior. 1 Right Lane(s).
511 Ontario · ON · updated 1 day ago
- Highway 417Lane closureeastbound
Maintenance between White Lake Rd (IC184)/Cr 2 (Antrim Truck Stop) and Ottawa Rd 29 (IC 180), Arnprior
Starts Tue, Oct 13, 9:00 a.m. EDT
Daily Maintenance on HWY 417 Eastbound between WHITE LAKE RD (IC184)/CR 2 (Antrim Truck Stop) and OTTAWA RD 29 (IC 180), Arnprior. 1 Right Lane(s).
511 Ontario · ON · updated 15 min ago
- Highway 404Lane closurenorthbound
Maintenance between Hwy 7 and Major Mackenzie Drive, Markham-Richmondhill
Starts Tue, Oct 13, 10:00 a.m. EDT
Daily Maintenance on HWY 404 Northbound between HWY 7 and MAJOR MACKENZIE DRIVE, Markham-Richmondhill . 1 Alternating Lane(s).
511 Ontario · ON · updated 4 days ago
- Highway 404Lane closurenorthbound
Maintenance between 407, Markham and 16TH Ave, Markham-Richmondhill
Starts Tue, Oct 13, 10:00 a.m. EDT
Daily Maintenance on HWY 404 Northbound between 407, Markham and 16TH AVE, Markham-Richmondhill . 1 Alternating Lane(s).
511 Ontario · ON · updated 4 days ago
- Highway 6Lane closuresouthbound
Maintenance between Freelton Road and East Flamborough Twp Road Con
Starts Tue, Oct 13, 12:00 p.m. EDT
Daily Maintenance on HWY 6 Southbound between FREELTON ROAD and EAST FLAMBOROUGH TWP ROAD CON. 11, Hamilton. 1 Alternating Lane(s).
511 Ontario · ON · updated 4 days ago
- Highway 6Lane closurenorthbound
Maintenance between East Flamborough Twp Road Con
Starts Tue, Oct 13, 12:00 p.m. EDT
Daily Maintenance on HWY 6 Northbound between EAST FLAMBOROUGH TWP ROAD CON. 11 and FREELTON ROAD, Hamilton. 1 Alternating Lane(s).
511 Ontario · ON · updated 4 days ago
- QEWLane closureFort Erie-bound
Construction, off-ramp at Mcleod Road, Niagara Falls
Starts Tue, Oct 13, 12:00 p.m. EDT
Daily Construction on QEW Fort Erie Bound Off-ramp at MCLEOD ROAD, Niagara Falls. 1 Alternating Lane(s).
511 Ontario · ON · updated 4 days ago
- Highway 69Lane closurenorthbound
Engineering Investigation between Bigwood Rd, French River, French River and Murdock River Rd, Estaire
Starts Tue, Oct 13, 12:00 p.m. EDT
Daily Engineering Investigation on HWY 69 Northbound between Bigwood Rd, French River, French River and MURDOCK RIVER RD, Estaire. 1 Right Lane(s).
511 Ontario · ON · updated 2 days ago
- Highway 400Lane closuresouthbound
Construction between 13TH Concession and Hwy 88, Bradford
Starts Tue, Oct 13, overnight
Nightly Construction on HWY 400 Southbound between 13TH CONCESSION and HWY 88, Bradford. 2 Alternating Lane(s).
511 Ontario · ON · updated September 30, 2026
- Highway 48Lane closurenorthbound
Construction between Pefferlaw Road and Riverside Drive, Georgina
Starts Tue, Oct 13, overnight
Nightly Construction on HWY 48 Northbound between PEFFERLAW ROAD and RIVERSIDE DRIVE, Georgina. 1 Alternating Lane(s).
511 Ontario · ON · updated 3 days ago
- Highway 10Lane closurenorthbound
Construction between Old School Road and Forks of the Credit Road, Caledon
Starts Tue, Oct 13, overnight
Nightly Construction on HWY 10 Northbound between OLD SCHOOL ROAD and FORKS OF THE CREDIT ROAD, Caledon. 1 Alternating Lane(s).
511 Ontario · ON · updated 2 days ago
- QEWRamp closureFort Erie-bound
Construction, off-ramp at Ontario Street -Beamsville, Lincoln
Starts Tue, Oct 13, overnight
Nightly Construction on QEW Fort Erie Bound Off-ramp at ONTARIO STREET -BEAMSVILLE, Lincoln. ALL LANES CLOSED.
511 Ontario · ON · updated 4 days ago
- QEWRamp closureFort Erie-bound
Construction, on-ramp at Victoria Avenue, Lincoln
Starts Tue, Oct 13, overnight
Nightly Construction on QEW Fort Erie Bound On-ramp at VICTORIA AVENUE, Lincoln. ALL LANES CLOSED.
511 Ontario · ON · updated 4 days ago
- QEWRamp closureFort Erie-bound
Construction, on-ramp at Casablanca Blvd
Starts Tue, Oct 13, overnight
Nightly Construction on QEW Fort Erie Bound On-ramp at CASABLANCA BLVD., Grimsby. ALL LANES CLOSED.
511 Ontario · ON · updated 4 days ago
- QEWRamp closureFort Erie-bound
Construction, off-ramp at Maple Avenue, Grimsby
Starts Tue, Oct 13, overnight
Nightly Construction on QEW Fort Erie Bound Off-ramp at MAPLE AVENUE, Grimsby. ALL LANES CLOSED.
511 Ontario · ON · updated 4 days ago
- QEWRamp closureFort Erie-bound
Construction, on-ramp at Bartlett Avenue, Grimsby
Starts Tue, Oct 13, overnight
Nightly Construction on QEW Fort Erie Bound On-ramp at BARTLETT AVENUE, Grimsby. ALL LANES CLOSED.
511 Ontario · ON · updated 4 days ago
- QEWRamp closureFort Erie-bound
Construction, off-ramp at Bartlett Avenue, Grimsby
Starts Tue, Oct 13, overnight
Nightly Construction on QEW Fort Erie Bound Off-ramp at BARTLETT AVENUE, Grimsby. ALL LANES CLOSED.
511 Ontario · ON · updated 4 days ago
- QEWRamp closureFort Erie-bound
Construction, off-ramp at Ontario Street -Beamsville, Lincoln
Starts Tue, Oct 13, overnight
Nightly Construction on QEW Fort Erie Bound Off-ramp at ONTARIO STREET -BEAMSVILLE, Lincoln. ALL LANES CLOSED.
511 Ontario · ON · updated 4 days ago
- QEWRamp closureFort Erie-bound
Construction, on-ramp at Maple Avenue, Grimsby
Starts Tue, Oct 13, overnight
Nightly Construction on QEW Fort Erie Bound On-ramp at MAPLE AVENUE, Grimsby. ALL LANES CLOSED.
511 Ontario · ON · updated 4 days ago
- QEWRamp closureFort Erie-bound
Construction, off-ramp at Victoria Avenue, Lincoln
Starts Tue, Oct 13, overnight
Nightly Construction on QEW Fort Erie Bound Off-ramp at VICTORIA AVENUE, Lincoln. ALL LANES CLOSED.
511 Ontario · ON · updated 4 days ago
- QEWRamp closureFort Erie-bound
Construction, off-ramp at Christie St / Lakeview Ave, Grimsby
Starts Tue, Oct 13, overnight
Nightly Construction on QEW Fort Erie Bound Off-ramp at CHRISTIE ST / LAKEVIEW AVE, Grimsby. ALL LANES CLOSED.
511 Ontario · ON · updated 4 days ago
- QEWRamp closureFort Erie-bound
Construction, on-ramp at Christie St / Lakeview Ave, Grimsby
Starts Tue, Oct 13, overnight
Nightly Construction on QEW Fort Erie Bound On-ramp at CHRISTIE ST / LAKEVIEW AVE, Grimsby. ALL LANES CLOSED.
511 Ontario · ON · updated 4 days ago
- QEWRamp closureFort Erie-bound
Construction, off-ramp at Christie St / Lakeview Ave, Grimsby
Starts Tue, Oct 13, overnight
Nightly Construction on QEW Fort Erie Bound Off-ramp at CHRISTIE ST / LAKEVIEW AVE, Grimsby. ALL LANES CLOSED.
511 Ontario · ON · updated 4 days ago
- QEWRamp closureFort Erie-bound
Construction, on-ramp at Victoria Avenue, Lincoln
Starts Tue, Oct 13, overnight
Nightly Construction on QEW Fort Erie Bound On-ramp at VICTORIA AVENUE, Lincoln. ALL LANES CLOSED.
511 Ontario · ON · updated 4 days ago
- QEWRamp closureFort Erie-bound
Construction, on-ramp at Ontario Street -Beamsville, Lincoln
Starts Tue, Oct 13, overnight
Nightly Construction on QEW Fort Erie Bound On-ramp at ONTARIO STREET -BEAMSVILLE, Lincoln. ALL LANES CLOSED.
511 Ontario · ON · updated 4 days ago
- Highway 401Lane closurewestbound
Construction, express at Brock Road, Pickering
Starts Tue, Oct 13, overnight
Nightly Construction on HWY 401 Westbound Express between BROCK ROAD and BROCK ROAD, Pickering. ALL LANES CLOSED.
511 Ontario · ON · updated 4 days ago
- Highway 403Ramp closureeastbound
Construction, off-ramp at Garden Ave, Brantford
Starts Tue, Oct 13, overnight
Nightly Construction on HWY 403 HAMILTON Eastbound Off-ramp at Garden Ave, Brantford. ALL LANES CLOSED.
511 Ontario · ON · updated September 28, 2026
- Highway 400Lane closurenorthbound
Moving maintenance between Hwy 11 Jct, Springwater and Severn River Bridge, Tay
Starts Tue, Oct 13, overnight
Nightly Moving Maintenance Closure on HWY 400 Northbound between HWY 11 JCT, Springwater and SEVERN RIVER BRIDGE, Tay. 1 Alternating Lane(s).
511 Ontario · ON · updated September 15, 2026
- Highway 400Lane closuresouthbound
Moving maintenance between Severn River Bridge, Tay and Hwy 11 Jct, Springwater
Starts Tue, Oct 13, overnight
Nightly Moving Maintenance Closure on HWY 400 Southbound between SEVERN RIVER BRIDGE, Tay and HWY 11 JCT, Springwater. 1 Alternating Lane(s).
511 Ontario · ON · updated September 15, 2026
- Highway 89Lane closurewestbound
Moving maintenance between Hwy 400 and Mono-Adjala Townline Road, Essa
Starts Tue, Oct 13, overnight
Nightly Moving Maintenance Closure on HWY 89 Westbound between HWY 400 and MONO-ADJALA TOWNLINE ROAD, Essa. 1 Alternating Lane(s).
511 Ontario · ON · updated September 15, 2026
- Highway 89Lane closureeastbound
Moving maintenance between Mono-Adjala Townline Road and Hwy 400, Essa
Starts Tue, Oct 13, overnight
Nightly Moving Maintenance Closure on HWY 89 Eastbound between MONO-ADJALA TOWNLINE ROAD and HWY 400, Essa. 1 Alternating Lane(s).
511 Ontario · ON · updated September 15, 2026
- Highway 400Lane closurenorthbound
Construction between Hwy 88 and 13TH Concession, Bradford
Starts Tue, Oct 13, overnight
Nightly Construction on HWY 400 Northbound between HWY 88 and 13TH CONCESSION, Bradford. 2 Alternating Lane(s).
511 Ontario · ON · updated September 30, 2026
- QEWLane closureFort Erie-bound
Construction between Burlington Skyway, Burlington and Centennial Pkwy, Hamilton
Starts Tue, Oct 13, overnight
Nightly Construction on QEW Fort Erie Bound between BURLINGTON SKYWAY, Burlington and CENTENNIAL PKWY, Hamilton. 1 Alternating Lane(s).
511 Ontario · ON · updated 3 days ago
- QEWLane closureToronto-bound
Construction between Centennial Pkwy, Hamilton and Burlington Skyway, Burlington
Starts Tue, Oct 13, overnight
Nightly Construction on QEW Toronto bound between CENTENNIAL PKWY, Hamilton and BURLINGTON SKYWAY, Burlington. 2 Alternating Lane(s).
511 Ontario · ON · updated 3 days ago
- Highway 404Lane closuresouthbound
Construction between Vandorf Sideroad, Aurora and Stouffville Road, Stouffville-Richmondhill
Starts Tue, Oct 13, overnight
Nightly Construction on HWY 404 Southbound between VANDORF SIDEROAD, Aurora and STOUFFVILLE ROAD, Stouffville-Richmondhill. 2 Alternating Lane(s).
511 Ontario · ON · updated 2 days ago
- Highway 400Lane closurenorthbound
Moving maintenance between Mapleview Drive, Barrie and Hwy 11 Jct, Springwater
Starts Tue, Oct 13, overnight
Nightly Moving Maintenance Closure on HWY 400 Northbound between MAPLEVIEW DRIVE, Barrie and HWY 11 JCT, Springwater. 1 Alternating Lane(s).
511 Ontario · ON · updated September 15, 2026
- Highway 400Lane closuresouthbound
Moving maintenance between Hwy 11 Jct, Springwater and Mapleview Drive, Barrie
Starts Tue, Oct 13, overnight
Nightly Moving Maintenance Closure on HWY 400 Southbound between HWY 11 JCT, Springwater and MAPLEVIEW DRIVE, Barrie. 1 Alternating Lane(s).
511 Ontario · ON · updated September 15, 2026
- Highway 11Lane closurenorthbound
Moving maintenance between Hwy 400, Oro Medonte and Severn River Bridge/West Branch, Severn
Starts Tue, Oct 13, overnight
Nightly Moving Maintenance Closure on HWY 11 Northbound between HWY 400, Oro Medonte and SEVERN RIVER BRIDGE/WEST BRANCH, Severn. 1 Alternating Lane(s).
511 Ontario · ON · updated September 15, 2026
- Highway 400Lane closuresouthbound
Moving maintenance between Mapleview Drive, Barrie and Canal Rd
Starts Tue, Oct 13, overnight
Nightly Moving Maintenance Closure on HWY 400 Southbound between MAPLEVIEW DRIVE, Barrie and CANAL RD., Bradford. 1 Alternating Lane(s).
511 Ontario · ON · updated September 15, 2026
- Highway 11Lane closuresouthbound
Moving maintenance between Severn River Bridge/West Branch, Severn and Hwy 400, Oro Medonte
Starts Tue, Oct 13, overnight
Nightly Moving Maintenance Closure on HWY 11 Southbound between SEVERN RIVER BRIDGE/WEST BRANCH, Severn and HWY 400, Oro Medonte. 1 Alternating Lane(s).
511 Ontario · ON · updated September 15, 2026
- Highway 12Lane closurenorthbound
Moving maintenance between Talbot River Br, Ramara and Atherley Rd, Orillia
Starts Tue, Oct 13, overnight
Nightly Moving Maintenance Closure on HWY 12 Northbound between TALBOT RIVER BR, Ramara and ATHERLEY RD, Orillia. 1 Alternating Lane(s).
511 Ontario · ON · updated September 15, 2026
- Highway 12Lane closuresouthbound
Moving maintenance between Hwy 93/Simcoe Road 93, Midland and Harvey Settlement Road/Fairgrounds Road, Oro Medonte
Starts Tue, Oct 13, overnight
Nightly Moving Maintenance Closure on HWY 12 Southbound between HWY 93/SIMCOE ROAD 93, Midland and HARVEY SETTLEMENT ROAD/FAIRGROUNDS ROAD, Oro Medonte. 1 Alternating Lane(s).
511 Ontario · ON · updated September 15, 2026
- Highway 26Lane closureeastbound
Moving maintenance between Lakeview Avenue, Clearview and Carson Road, Springwater
Starts Tue, Oct 13, overnight
Nightly Moving Maintenance Closure on HWY 26 Eastbound between LAKEVIEW AVENUE, Clearview and CARSON ROAD, Springwater. 1 Alternating Lane(s).
511 Ontario · ON · updated September 15, 2026
- Highway 12Lane closuresouthbound
Moving maintenance between Atherley Rd, Orillia and Talbot River Br, Ramara
Starts Tue, Oct 13, overnight
Nightly Moving Maintenance Closure on HWY 12 Southbound between ATHERLEY RD, Orillia and TALBOT RIVER BR, Ramara. 1 Alternating Lane(s).
511 Ontario · ON · updated September 15, 2026
- Highway 12Lane closurenorthbound
Moving maintenance between Harvey Settlement Road/Fairgrounds Road, Oro Medonte and Hwy 93/Simcoe Road 93, Midland
Starts Tue, Oct 13, overnight
Nightly Moving Maintenance Closure on HWY 12 Northbound between HARVEY SETTLEMENT ROAD/FAIRGROUNDS ROAD, Oro Medonte and HWY 93/SIMCOE ROAD 93, Midland. 1 Alternating Lane(s).
511 Ontario · ON · updated September 15, 2026
- Highway 93Lane closuresouthbound
Moving maintenance between Hwy 12/Angela Schmidt Foster Road, Tay and Hwy 400, Springwater
Starts Tue, Oct 13, overnight
Nightly Moving Maintenance Closure on HWY 93 Southbound between HWY 12/ANGELA SCHMIDT FOSTER ROAD, Tay and HWY 400, Springwater. 1 Alternating Lane(s).
511 Ontario · ON · updated September 15, 2026
- Highway 93Lane closurenorthbound
Moving maintenance between Hwy 400, Springwater and Hwy 12/Angela Schmidt Foster Road, Tay
Starts Tue, Oct 13, overnight
Nightly Moving Maintenance Closure on HWY 93 Northbound between HWY 400, Springwater and HWY 12/ANGELA SCHMIDT FOSTER ROAD, Tay. 1 Alternating Lane(s).
511 Ontario · ON · updated September 15, 2026
- Highway 26Lane closurewestbound
Moving maintenance between Carson Road, Springwater and Lakeview Avenue, Clearview
Starts Tue, Oct 13, overnight
Nightly Moving Maintenance Closure on HWY 26 Westbound between CARSON ROAD, Springwater and LAKEVIEW AVENUE, Clearview. 1 Alternating Lane(s).
511 Ontario · ON · updated September 15, 2026
- Highway 11Lane closurenorthbound
Maintenance between Simcoe Road 93/Penetanguishene Road and Line 3, Oro Medonte
Starts Tue, Oct 13, overnight
Nightly Maintenance on HWY 11 Northbound between SIMCOE ROAD 93/PENETANGUISHENE ROAD and LINE 3, Oro Medonte. 1 Alternating Lane(s).
511 Ontario · ON · updated September 25, 2026
- Highway 11Lane closurenorthbound
Maintenance between Line 6 and Line 7/Simcoe Road 27, Oro Medonte
Starts Tue, Oct 13, overnight
Nightly Maintenance on HWY 11 Northbound between LINE 6 and LINE 7/SIMCOE ROAD 27, Oro Medonte. 1 Alternating Lane(s).
511 Ontario · ON · updated September 25, 2026
- Highway 11Lane closuresouthbound
Moving maintenance between South Sparrow Lake Road and Ego Road/Grand Tamarack Cres, Severn
Starts Tue, Oct 13, overnight
Nightly Moving Maintenance Closure on HWY 11 Southbound between SOUTH SPARROW LAKE ROAD and EGO ROAD/GRAND TAMARACK CRES, Severn. 1 Alternating Lane(s).
511 Ontario · ON · updated September 25, 2026
- Highway 11Lane closuresouthbound
Moving maintenance between Grass Lake Line and South Sparrow Lake Road, Severn
Starts Tue, Oct 13, overnight
Nightly Moving Maintenance Closure on HWY 11 Southbound between GRASS LAKE LINE and SOUTH SPARROW LAKE ROAD, Severn. 1 Alternating Lane(s).
511 Ontario · ON · updated September 25, 2026
- Highway 11Lane closurenorthbound
Moving maintenance between Line 10 and Line 11, Oro Medonte
Starts Tue, Oct 13, overnight
Nightly Moving Maintenance Closure on HWY 11 Northbound between LINE 10 and LINE 11, Oro Medonte. 1 Alternating Lane(s).
511 Ontario · ON · updated September 25, 2026
- Highway 11Lane closuresouthbound
Maintenance at Sundial Dr/Carlyon Line, Severn
Starts Tue, Oct 13, overnight
Nightly Maintenance on HWY 11 Southbound between SUNDIAL DR/CARLYON LINE and SUNDIAL DR/CARLYON LINE, Severn. 1 Right Lane(s).
511 Ontario · ON · updated September 25, 2026
- Highway 11Lane closuresouthbound
Moving maintenance between Line 8/Simcoe Rd 20 and Line 7/Simcoe Road 27, Oro Medonte
Starts Tue, Oct 13, overnight
Nightly Moving Maintenance Closure on HWY 11 Southbound between LINE 8/SIMCOE RD 20 and LINE 7/SIMCOE ROAD 27, Oro Medonte. 1 Alternating Lane(s).
511 Ontario · ON · updated September 25, 2026
- Highway 11Lane closuresouthbound
Moving maintenance between Line 7/Simcoe Road 27 and Line 6, Oro Medonte
Starts Tue, Oct 13, overnight
Nightly Moving Maintenance Closure on HWY 11 Southbound between LINE 7/SIMCOE ROAD 27 and LINE 6, Oro Medonte. 1 Alternating Lane(s).
511 Ontario · ON · updated September 25, 2026
- Highway 11Lane closuresouthbound
Moving maintenance between Line 7/Simcoe Road 27 and Line 5, Oro Medonte
Starts Tue, Oct 13, overnight
Nightly Moving Maintenance Closure on HWY 11 Southbound between LINE 7/SIMCOE ROAD 27 and LINE 5, Oro Medonte. 1 Alternating Lane(s).
511 Ontario · ON · updated September 25, 2026
- Highway 400Lane closurenorthbound
Moving maintenance between Forbes Road/Simcoe Road 11 and Hwy 93/Penetanguishene Rd/Simcoe Road 9, Springwater
Starts Tue, Oct 13, overnight
Nightly Moving Maintenance Closure on HWY 400 Northbound between FORBES ROAD/SIMCOE ROAD 11 and HWY 93/PENETANGUISHENE RD/SIMCOE ROAD 9, Springwater. 1 Alternating Lane(s).
511 Ontario · ON · updated September 25, 2026
- Highway 401Lane closurewestbound
Construction between Harmony Road and Ritson Road, Oshawa
Starts Tue, Oct 13, overnight
Nightly Construction on HWY 401 Westbound between HARMONY ROAD and RITSON ROAD, Oshawa. 2 Alternating Lane(s).
511 Ontario · ON · updated September 28, 2026
- Highway 400Lane closuresouthbound
Construction, collector between Hwy 26/ Bayfield Street and Dunlop Street / Simcoe Road 90, Barrie
Starts Tue, Oct 13, overnight
Nightly Construction on HWY 400 Southbound Collector between HWY 26/ BAYFIELD STREET and DUNLOP STREET / SIMCOE ROAD 90, Barrie. 2 Alternating Lane(s).
511 Ontario · ON · updated October 1, 2026
- Highway 400Lane closurenorthbound
Construction, collector between Essa Rd / Simcoe Rd 27 and Dunlop Street / Simcoe Road 90, Barrie
Starts Tue, Oct 13, overnight
Nightly Construction on HWY 400 Northbound Collector between ESSA RD / SIMCOE RD 27 and DUNLOP STREET / SIMCOE ROAD 90, Barrie. 2 Alternating Lane(s).
511 Ontario · ON · updated October 1, 2026
- Highway 11Lane closuresouthbound
Engineering Investigation between Line 11 and Simcoe Road 93/Penetanguishene Road, Oro Medonte
Starts Tue, Oct 13, overnight
Nightly Engineering Investigation on HWY 11 Southbound between LINE 11 and SIMCOE ROAD 93/PENETANGUISHENE ROAD, Oro Medonte. 1 Alternating Lane(s).
511 Ontario · ON · updated 5 days ago
- Highway 11Lane closurenorthbound
Engineering Investigation between Line 5 and Line 11, Oro Medonte
Starts Tue, Oct 13, overnight
Nightly Engineering Investigation on HWY 11 Northbound between LINE 5 and LINE 11, Oro Medonte. 1 Alternating Lane(s).
511 Ontario · ON · updated 5 days ago
- Highway 401Lane closureeastbound
Construction, express between Second Line Road and Hwy 403, Mississauga
Starts Tue, Oct 13, overnight
Nightly Construction on HWY 401 Eastbound Express between SECOND LINE ROAD and HWY 403, Mississauga. 2 Alternating Lane(s).
511 Ontario · ON · updated 4 days ago
- Highway 9Lane closurewestbound
Construction between 6TH Line East, Caledon and North Jct Hwy 10-Buena Vista Drive, Orangeville
Starts Tue, Oct 13, overnight
Nightly Construction on HWY 9 Westbound between 6TH LINE EAST, Caledon and NORTH JCT HWY 10-BUENA VISTA DRIVE, Orangeville. 1 Alternating Lane(s).
511 Ontario · ON · updated 4 days ago
- Highway 9Lane closureeastbound
Construction between North Jct Hwy 10-Buena Vista Drive, Orangeville and 6TH Line East, Caledon
Starts Tue, Oct 13, overnight
Nightly Construction on HWY 9 Eastbound between NORTH JCT HWY 10-BUENA VISTA DRIVE, Orangeville and 6TH LINE EAST, Caledon. 1 Alternating Lane(s).
511 Ontario · ON · updated 4 days ago
- Highway 11Lane closurenorthbound
Moving maintenance at Line 2/Golf Course Rd, Oro Medonte
Starts Tue, Oct 13, overnight
Nightly Moving Maintenance Closure on HWY 11 Northbound between LINE 2/GOLF COURSE RD and LINE 2/GOLF COURSE RD, Oro Medonte. 1 Alternating Lane(s).
511 Ontario · ON · updated 4 days ago
- QEWLane closureToronto-bound
Construction between Bartlett Avenue and Ontario Street -Grimsby, Grimsby
Starts Tue, Oct 13, overnight
Nightly Construction on QEW Toronto bound between BARTLETT AVENUE and ONTARIO STREET -GRIMSBY, Grimsby. 1 Left Lane(s).
511 Ontario · ON · updated 3 days ago
- Highway 12Lane closurenorthbound
Construction between Hwy 48 South Jct, Brock and Durham Rd 50, Ramara
Starts Tue, Oct 13, overnight
Nightly Construction on HWY 12 Northbound between HWY 48 SOUTH JCT, Brock and DURHAM RD 50, Ramara. 1 Alternating Lane(s).
511 Ontario · ON · updated 3 days ago
- Highway 404Lane closuresouthbound
Construction, collector between Green Lane, Gwillimbury and Aurora Road, Whitchurch-Stouffville
Starts Tue, Oct 13, overnight
Nightly Construction on HWY 404 Southbound Collector between GREEN LANE, Gwillimbury and AURORA ROAD, Whitchurch-Stouffville. 1 Alternating Lane(s).
511 Ontario · ON · updated 3 days ago
- Highway 11Lane closuresouthbound
Moving maintenance at Line 8/Simcoe Rd 20, Oro Medonte
Starts Tue, Oct 13, overnight
Nightly Moving Maintenance Closure on HWY 11 Southbound between LINE 8/SIMCOE RD 20 and LINE 8/SIMCOE RD 20, Oro Medonte. 1 Alternating Lane(s).
511 Ontario · ON · updated 2 days ago
- Highway 11Lane closuresouthbound
Moving maintenance at Line 7/Simcoe Road 27, Oro Medonte
Starts Tue, Oct 13, overnight
Nightly Moving Maintenance Closure on HWY 11 Southbound between LINE 7/SIMCOE ROAD 27 and LINE 7/SIMCOE ROAD 27, Oro Medonte. 1 Alternating Lane(s).
511 Ontario · ON · updated 2 days ago
- Highway 9Lane closurewestbound
Construction between King Twp 12 Th Concession, King Township and Caledon King Townline/Boundary Road, Caledon
Starts Tue, Oct 13, overnight
Nightly Construction on HWY 9 Westbound between KING TWP 12 TH CONCESSION, King Township and CALEDON KING TOWNLINE/BOUNDARY ROAD, Caledon. 1 Right Lane(s).
511 Ontario · ON · updated 2 days ago
- Highway 9Lane closureeastbound
Construction between Caledon King Townline/Boundary Road, Caledon and King Twp 12 Th Concession, King Township
Starts Tue, Oct 13, overnight
Nightly Construction on HWY 9 Eastbound between CALEDON KING TOWNLINE/BOUNDARY ROAD, Caledon and KING TWP 12 TH CONCESSION, King Township. 1 Right Lane(s).
511 Ontario · ON · updated 2 days ago
- Highway 11Lane closuresouthbound
Moving maintenance at New Brailey Line/Bayou Road, Severn
Starts Tue, Oct 13, overnight
Nightly Moving Maintenance Closure on HWY 11 Southbound between NEW BRAILEY LINE/BAYOU ROAD and NEW BRAILEY LINE/BAYOU ROAD, Severn. 1 Alternating Lane(s).
511 Ontario · ON · updated 2 days ago
- Highway 404Lane closurenorthbound
Construction between Stouffville Road, Stouffville-Richmondhill and Aurora Road, Whitchurch-Stouffville
Starts Tue, Oct 13, overnight
Nightly Construction on HWY 404 Northbound between STOUFFVILLE ROAD, Stouffville-Richmondhill and AURORA ROAD, Whitchurch-Stouffville. 2 Alternating Lane(s).
511 Ontario · ON · updated 2 days ago
- Highway 3Lane closureeastbound
Construction between Springwater Road, Orwell and Rogers Road, Aylmer
Starts Tue, Oct 13, overnight
Nightly Construction on HWY 3 Eastbound between Springwater Road, Orwell and Rogers Road, Aylmer. 1 Right Lane(s).
511 Ontario · ON · updated 2 days ago
- Highway 400Ramp closurenorthbound
Construction, on-ramp at Dunlop Street / Simcoe Road 90, Barrie
Starts Tue, Oct 13, overnight
Nightly Construction on HWY 400 Northbound On-ramp at DUNLOP STREET / SIMCOE ROAD 90, Barrie. ALL LANES CLOSED.
511 Ontario · ON · updated October 1, 2026
- 247 less urgent entries not shown. All of them are on the live map.
Provinces covered: Ontario, British Columbia, Alberta, Quebec.