British Columbia Highway 52 road conditions
Closures, winter road conditions, construction and collisions on British Columbia Highway 52, in order along the road.
British Columbia Highway 52: slippery sections reported
As of 1:08 p.m. PDT. 2 entries; latest update 6 hr ago.
Collisions and incidents now 0
Winter road conditions 2
- Slippery sectionsboth directions
Slippery sections: Kelly Lake Road (127 km east of Tumbler Ridge) and Highway 52 N; Highway 29 (Tumbler Ridge)
Since Tue, Nov 24, 6:26 a.m. PDT
Slippery sections between Kelly Lake Road (127 km east of Tumbler Ridge) and Highway 52 N; Highway 29 (Tumbler Ridge).
DriveBC · BC · updated 6 hr ago
- Slippery sectionsboth directions
Slippery sections: 200 Road (124 km north of Tumbler Ridge) and the end of Highway 52 N (Heritage Highway) (Tumbler Ridge)
Since Tue, Nov 24, 6:26 a.m. PDT
Slippery sections between 200 Road (124 km north of Tumbler Ridge) and the end of Highway 52 N (Heritage Highway) (Tumbler Ridge).
DriveBC · BC · updated 6 hr ago
British Columbia Highway 52 since September 2026
British Columbia Highway 52 is 83rd for events among Canada's 217 recorded highways.
On British Columbia Highway 52, Thursday is the busiest day (8 events), and 43% of all events start between 5am and 7am.
From the provincial 511 records kept by Roadscore; times are local. Construction, closures, collisions and road condition reports all count as events.
Latest events
Road conditionsRoad condition
November 26, 2026, 4:30 a.m. PDT · listed for 36 hours
Road conditionsRoad condition
November 24, 2026, 6:46 a.m. PDT · listed for 4 days
Road conditionsRoad condition
November 23, 2026, 4:46 a.m. PDT · listed for 1½ hours
Road conditionsRoad condition
November 17, 2026, 7:46 a.m. PDT · listed for 46½ hours
Road conditionsRoad condition
November 16, 2026, 4:15 p.m. PDT · listed for 3 days
Road conditionsRoad condition
November 15, 2026, 5:30 a.m. PDT · listed for 37 hours
Road conditionsRoad condition
November 14, 2026, 6:30 a.m. PDT · listed for 47 hours
Road conditionsRoad condition
November 13, 2026, 7:15 a.m. PDT · listed for 21 hours
Driving tips for British Columbia Highway 52
- Most events on British Columbia Highway 52 start on Thursdays between 5am and 7am: check before leaving at that time. (from the records above)
- Winter tires or chains are required on most British Columbia highways from October 1 to April 30, where regulatory signs mark the route; on some routes without mountain passes the requirement ends March 31. BC government: winter tire and chain-up routes
British Columbia Highway 52 by email, every morning
Collisions, winter road conditions and closures on British Columbia Highway 52 at 6:00 a.m. Eastern. Free, and one click to stop.
More options: more highways, provinces, or Mondays only.
What we cover in British Columbia
- Construction and lane closuresLive · 511 Alberta, DriveBC, BC Wildfire Service, 511 Yukon, City open data (Toronto, Vancouver, Calgary)
- Collisions and incidentsLive · 511 Alberta, DriveBC, BC Wildfire Service, 511 Yukon, City open data (Toronto, Vancouver, Calgary)
- Winter road conditionsLive · 511 Alberta, DriveBC, BC Wildfire Service, 511 Yukon, City open data (Toronto, Vancouver, Calgary)
Sources 511 Alberta, Government of Alberta (Alberta Transportation and Economic Corridors) · DriveBC, Government of British Columbia · BC Wildfire Service, Government of British Columbia · 511 Yukon, Government of Yukon · City of Toronto, City of Vancouver and City of Calgary open data
Questions
- Is British Columbia Highway 52 closed today?
- No full closure of British Columbia Highway 52 is reported at the moment. Winter conditions are reported: Slippery sections: 200 Road (124 km north of Tumbler Ridge) and the end of Highway 52 N (Heritage Highway) (Tumbler Ridge); Slippery sections: Kelly Lake Road (127 km east of Tumbler Ridge) and Highway 52 N; Highway 29 (Tumbler Ridge).
- When are there the most events on British Columbia Highway 52?
- In the 511 records, most events on British Columbia Highway 52 start on Thursdays between 5am and 7am, local time (30 events counted).